Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Tata Power Renewables Commissions 198 MW Group Captive Project in Karur, Tamil Nadu
Renewable energy

Tata Power Renewables Commissions 198 MW Group Captive Project in Karur, Tamil Nadu

Shweta KumariBy Shweta KumariFebruary 3, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
TPREL commissions 198 MW wind project in Tamil Nadu, supplying clean power to Tata Steel under group captive model

Tata Power Renewable Energy Limited (TPREL), one of India’s leading renewable energy companies and a subsidiary of The Tata Power Company Limited (‘Tata Power’), has successfully commissioned a 198 MW wind energy project for Tata Steel under the Group Captive model in Karur, Tamil Nadu, one of the largest wind projects of its kind.

The project comprises 55 wind turbine generators of 3.6 MW each and is designed to generate 31 million units of clean electricity annually, further advancing Tata Steel’s decarbonization journey and strengthening TPREL’s contribution to India’s renewable energy capacity. The project offsets 26,350 tons of CO₂ annually, thereby ensuring a green supply.

One of the key highlights of this project is the strategic unbundling of the scope into multiple packages, all of which were executed directly by TPREL. Rather than relying on OEMs for Balance of Plant (BOP), Civil BOP, Engineering & Construction, Transmission Lines, 33 kV systems, and SY, the project was delivered through a self-EPC model—underscoring TPREL’s strong in-house capabilities, engineering excellence and its successful execution of a mega-scale wind project.

The Karur project overcame several execution challenges through meticulous planning and innovative engineering. Massive turbine components were transported to the site with minimal disruption to local communities, underscoring TPREL’s responsible approach to development. Hard rock formations during excavation were efficiently managed with advanced direct-to-hole machinery, while the seamless movement of over 516 cubic meters of concrete in a 12-hour operation reflected the team’s strong coordination and project management capabilities.

Despite these challenges, the project was executed at record speed, with the foundation work completed in just 126 days and the installation of the wind turbine generators achieved in 167 days. These milestones highlight TPREL’s unmatched project execution capabilities and its ability to deliver large-scale renewable projects with scale, and resilience.

This partnership reinforces TPREL’s position as a leader in India’s renewable energy transition, playing a vital role in advancing the country’s target of reaching 500 GW of renewable energy capacity by 2030. It also reflects TPREL’s focus on scaling up wind-led clean energy projects that are reliable, dispatchable, and economically viable.

TPREL has a wind energy portfolio exceeding 3.7 GW, with over 1.2 GW operational and the remainder under various stages of development across Rajasthan, Gujarat, Maharashtra, Andhra Pradesh, Karnataka, and Tamil Nadu.

This initiative supports Tata Power’s overarching goal of achieving 100% clean energy by 2045 and complements its expanding renewable energy portfolio, which currently totals 15.7 GW, with 6.9 GW sourced from clean energy.

With this project, TPREL’s total renewable utility capacity has reached 11.6 GW. Currently, 6.1 GW of this capacity is operational, comprising 4.9 GW of solar and 1.2 GW of wind energy. Additionally, 5.8 GW is under various stages of implementation, evenly split between 3 GW of solar and 2.8 GW of wind projects. These ongoing projects are expected to be completed in phases over the next 6 to 24 months in a staggered manner.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy transition India News industrial decarbonisation Power Sector India renewable energy Tata Power wind energy India
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.