Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Solar » Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant
Solar

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

Shivangi GuptaBy Shivangi GuptaSeptember 3, 20264 Mins Read
Facebook Twitter LinkedIn WhatsApp
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Solar module manufacturer Cosmic PV Power Limited has received the final observation from the Securities and Exchange Board of India (SEBI), bringing the company a step closer to its proposed ₹640 crore initial public offering (IPO). The regulatory milestone comes as Cosmic PV Power seeks to expand beyond module manufacturing into solar cell production, EPC and emerging clean-energy businesses.
According to SEBI’s processing-status data dated September 3, 2026, the regulator issued its final observation on the company’s offer document, which was filed on April 2, 2026. Systematix Corporate Services Limited is the lead manager for the proposed issue.
The IPO comprises a fresh issue of equity shares worth up to ₹540 crore and an offer for sale of up to ₹100 crore. The company plans to list its shares on both the BSE and NSE.
A major focus of the IPO proceeds will be the company’s planned 1.10 GW TOPCon solar cell manufacturing facility in Narmadapuram, Madhya Pradesh. Cosmic PV Power proposes to deploy ₹497.16 crore of the net proceeds from the fresh issue towards the project.
The facility is being developed across 24.66 hectares at the Manufacturing Zone for Power and Renewable Energy Equipment in Phase II, I/A Mohasa, Babai. Land for the project was allotted by Madhya Pradesh Development Corporation Limited in January 2026.
The proposed cell plant represents a significant step toward backward integration for Cosmic PV Power, which currently operates across solar PV module manufacturing, EPC services and aluminium frame manufacturing. The company expects the facility to improve cost competitiveness while supporting compliance with evolving regulatory requirements, including the Approved List of Models and Manufacturers (ALMM) framework.
Cosmic PV Power expects the Narmadapuram facility to become operational by June 2027. The expansion would give the company greater control over its solar manufacturing value chain while reducing dependence on externally sourced cells.

Manufacturing Capacity Expands

Cosmic PV Power began manufacturing operations in 2021 with a 100 MW module production facility. Its installed module capacity increased to 1.40 GW by September 2025 and subsequently reached 3 GW annually by the date of its draft offer document.
The company operates two module manufacturing facilities, including a 1.40 GW facility producing Mono PERC and G-12RN TOPCon modules and a 1.60 GW facility designed for G-12RN TOPCon modules. The latter was awaiting a factory licence at the time of the draft offer document.
The company has also seen a sharp increase in its order book. Its order book stood at 1,577.47 MW, valued at approximately ₹1,251.51 crore, as of September 30, 2025, compared with just 12.69 MW worth ₹12.37 crore in FY2024.
Financial performance has expanded alongside its manufacturing scale. Revenue from operations increased from ₹48.10 crore in FY2023 to ₹99.95 crore in FY2024 and ₹245.16 crore in FY2025. For the six months ended September 30, 2025, revenue stood at ₹181.69 crore.
Profit after tax rose from ₹1.84 crore in FY2023 to ₹6.58 crore in FY2024 and ₹24.44 crore in FY2025, while operating EBITDA increased to ₹39.04 crore from ₹11.40 crore over the same period.

Strong OEM Exposure, Diversification Ahead

Cosmic PV Power has established a significant presence as both a solar module supplier and OEM manufacturer. During the six months ended September 30, 2025, sales to OEM customers accounted for 60.49% of revenue from operations.
The company had served more than 661 customers, including 36 OEMs and 81 EPC companies, as of September 2025. However, customer concentration remains a key business risk, with its top 10 customers contributing 80.10% of revenue during the period.
Beyond solar cells, Cosmic PV Power plans to explore opportunities in battery energy storage systems (BESS), while expanding its EPC operations and distribution network. The company also intends to diversify its customer base and improve operational efficiency.
With SEBI’s final observation now secured, the proposed IPO marks an important funding and expansion milestone for Cosmic PV Power. The planned cell manufacturing facility, combined with its growing module capacity, EPC ambitions and potential entry into energy storage, signals a broader strategy to build an integrated clean-energy manufacturing platform.
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS Cosmic PV Power India News renewable energy SEBI Solar
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

Industry Leaders Call for ‘Made in India’ Battery Storage

Industry Leaders Call for ‘Made in India’ Battery Storage Push at IESA Connect

Power Grid Corporation Wins Transmission Project

Power Grid Corporation Wins Transmission Project with Rs 3,244 Crore Annual Charges

Leave A Reply Cancel Reply

11 + 6 =

Renewable energy
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026
Power Grid Corporation Wins Transmission Project

Power Grid Corporation Wins Transmission Project with Rs 3,244 Crore Annual Charges

September 3, 2026
Zendure and Joybuy Partner

Zendure and Joybuy Partner to Deliver AI-Powered Home Energy Storage to German Homes

September 3, 2026
Batteries
Industry Leaders Call for ‘Made in India’ Battery Storage

Industry Leaders Call for ‘Made in India’ Battery Storage Push at IESA Connect

September 3, 2026
Bondada Engineering Incorporates Subsidiary

Bondada Engineering Incorporates Subsidiary to Develop 225 MW/450 MWh BESS Project in Andhra Pradesh

September 2, 2026
Blueleaf Energy and Universal Peak Secure Financing

Blueleaf Energy and Universal Peak Secure Financing for 100 MW/400 MWh Malaysia BESS Project

September 2, 2026
U.S. Adds 20 GWh of Energy Storage Capacity in Q2

U.S. Adds 20 GWh of Energy Storage Capacity in Q2, Largest Quarter on Record

September 2, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.