The Battery Magazine Logo

Subscribe to The Battery Magazine's Current Newsletter & never miss an update!

    Close Menu
    The Battery MagazineThe Battery Magazine
    • Home
    • Batteries
      • EV & Automotive
      • Portable Power
      • Stationary & Industrial
    • Articles
    • Charging
    • Manufacturing
    • Renewable
    • Hydrogen
    • Tenders
      • Energy Storage
      • Renewable Tender
    • Events
    • E-Mag
    Facebook LinkedIn WhatsApp
    The Battery MagazineThe Battery Magazine
    • Home
    • Batteries
      • EV & Automotive
      • Portable Power
      • Stationary & Industrial
    • Articles
    • Charging
    • Manufacturing
    • Renewable
    • Hydrogen
    • Tenders
      • Energy Storage
      • Renewable Tender
    • Events
    • E-Mag
    LinkedIn Facebook WhatsApp
    The Battery MagazineThe Battery Magazine
    Home » Sigenergy’s 20 MWh Modular C&I BESS Project in Malko Tarnovo

    Sigenergy’s 20 MWh Modular C&I BESS Project in Malko Tarnovo

    PrakashBy PrakashJune 4, 2025 Battery 3 Mins Read
    Facebook Twitter LinkedIn WhatsApp
    Sigenergy is redefining C&I energy storage with 20 MWh modular power, unmatched safety, and zero-maintenance resilience.

    Sigenergy brought together nearly 300 global energy professionals in Burgas to explore the future of commercial and industrial (C&I) energy storage. A key highlight of the event was a visit to a landmark 20 MWh project in Malko Tarnovo, powered by Sigenergy’s modular C&I battery energy storage system (BESS). The project highlights the scalability and real-world impact of next-generation storage technology.

    In partnership with Trakia MT Ltd., a leading Bulgarian solar company, the system is installed on a solar farm and features 90 Sigenergy C&I hybrid inverters combined with the SigenStack modular storage solution.

    “Sigenergy’s mission is to accelerate the global transition to clean energy with innovative and scalable storage solutions. This project exemplifies how advanced battery systems can drive business growth and decarbonization across industries.”

    – Tony Xu, founder and CEO of Sigenergy.

    Modularity Transforming C&I Energy Storage

    SigenStack introduces a truly modular approach to C&I energy storage—replacing bulky containerized systems with stackable 12 kWh battery packs. With plug-and-play connectors and tool-free installation, the system eliminates complex wiring and the need for cranes and heavy machinery.

    Thanks to this design, the entire 20 MWh system was installed in just 10 days and fully commissioned within 2 days.

    “The installation was incredibly smooth—more like assembling building blocks than deploying industrial infrastructure. This modular design is a game-changer for the C&I energy storage sector.”

    – Galina a Peycheva-Miteva, owner of Trakia MT Ltd.

    Safety Engineered at the Pack Level

    Sigenergy’s C&I BESS solutions set new benchmarks for system safety. At the heart of this innovation is the SigenStack system, engineered with safety at every level. Each 12 kWh battery pack features six layers of protection: temperature sensors, internal fire suppression units, aerogel insulation, decompression valves, high-temperature-resistant insulation pads, and smoke detectors. This configuration enables early detection of thermal runaway at the pack level and initiates a rapid, localized response within seconds.

    In contrast, conventional cabinet-style systems typically lack compartmentalization and may take over a minute to react, increasing the risk of fire propagation. By isolating incidents at the module level, SigenStack significantly enhances system reliability and operational safety.

    Its advanced inverter platform includes ultra-fast 500 ms anti-backflow protection and long-range arc fault circuit interrupter (AFCI) technology capable of detecting faults up to 500 meters.

    To further validate its safety performance, Sigenergy partnered with global assurance provider Intertek to publish a C&I Safety White Paper. The results confirm full compliance with UL 9540A and IEC 62619, structural stability under extreme testing, and sustained operational efficiency above 95%.

    Resilience Made for Zero Maintenance

    Built on robust safety and modular design, Sigenergy’s C&I BESS supports 24/7 autonomous operation. With an IP66 rating for dust and water resistance, it delivers reliable performance across diverse environmental conditions. Conventional cabinet-style systems, however, often contain more vulnerable components and demand monthly inspections, half-year part replacements, and comprehensive annual maintenance.

    Real-time monitoring via a cloud-based platform provides full visibility into system status, energy throughput, and alarms, significantly reducing the need for on-site inspections. Maintenance is also streamlined: faulty battery packs can be replaced individually within two hours, without full system diagnostics or on-site technician intervention. This reduces downtime, simplifies spare parts logistics, and minimizes operational costs.

    The successful delivery of this project demonstrates Sigenergy’s excellence in installation speed, safety, operational reliability, and smart management. Looking ahead, Sigenergy is committed to expanding its global footprint, driving the adoption of safer, more efficient, and sustainable energy solutions worldwide.

    BESS CleanTech ModularPower Sigenergy system safety Trakia MT Ltd
    Prakash

    More article from Prakash

    Keep Reading

    Avaada Electro Appoints Kaushal Shah as Chief Financial Officer

    Jinko ESS Secures 140 MWh UK Grid-Scale Energy Storage Project with AGR Renewables

    Jinko ESS Deploys 8 SunGiga Storage Systems for Commercial Energy Efficiency in Wenzhou

    Comments are closed.

    MANUFACTURING & MATERIALS

    LG Energy Solution Reports Robust Q2 2025 Performance

    July 25, 2025

    Lucid Launches MINAC Partnership to Boost U.S. EV Mineral Supply Chain

    July 24, 2025

    Himadri Eyes Larger Sicona Stake to Boost EV Battery Tech

    July 23, 2025

    Xcel Energy Unveils New Power Projects to Fuel Growth in Texas and New Mexico

    July 21, 2025
    Batteries

    Avaada Electro Appoints Kaushal Shah as Chief Financial Officer

    August 4, 2025

    Jinko ESS Secures 140 MWh UK Grid-Scale Energy Storage Project with AGR Renewables

    August 4, 2025

    Jinko ESS Deploys 8 SunGiga Storage Systems for Commercial Energy Efficiency in Wenzhou

    August 4, 2025

    Rays Power Infra Secures 1,440 MW Clean Energy Projects with 830 MWh BESS Across India

    August 4, 2025

    Subscribe for Updates

    Get the latest news about energy storage in your inbox.

      © 2025 Thebatterymagazine.
      • Home
      • About Us
      • Contact Us
      • Privacy Policy
      • Terms of Service

      Type above and press Enter to search. Press Esc to cancel.