Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » SRP and Google Launch Collaboration to Advance Long-Duration Energy Storage Innovation
Batteries

SRP and Google Launch Collaboration to Advance Long-Duration Energy Storage Innovation

PrakashBy PrakashSeptember 9, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
SRP and Google Launch Collaboration to Advance Long-Duration Energy Storage Innovation

Salt River Project (SRP) and Google have announced a first-of-its-kind research collaboration to better understand the real-world performance of emerging non-lithium-ion long-duration energy storage (LDES) technologies, aiming to accelerate the advancements needed to deploy LDES at scale.

As part of the research collaboration, Google will fund a portion of the costs for LDES pilot projects developed for SRP’s grid. Google will evaluate data on the pilot projects’ operational performance and provide input on the research and testing plans.

“We believe that long-duration energy storage will play an essential role in meeting SRP’s sustainability goals and ensuring grid reliability,” said Chico Hunter, SRP Manager of Innovation and Development. “This first-of-its-kind research collaboration with Google will bring additional insight into the viability of these new technologies that could move them to maturity more quickly.”

SRP and Google each have ambitious sustainability goals. SRP is committed to achieving net-zero carbon emissions by 2050. Google is working toward the ambition of running its global data centers and offices on 24/7 carbon-free energy, as well as achieving net zero emissions across its operations and value chain.

“Long-duration energy storage is a key technology in the portfolio of advanced energy solutions that we want to bring to market faster—to unlock stronger, cleaner, more resilient grids,” said Lucia Tian, Head of Advanced Energy Technologies at Google. “Through our collaboration with SRP, we aim to accelerate the innovation and technological advancements necessary to deploy LDES solutions at scale so communities in Arizona and beyond can meet their power needs reliably and cost-effectively for years to come.”

SRP issued RFPs in 2022 and 2024 for LDES technology demonstration projects and will explore with Google the inclusion of multiple projects in the research collaboration.

This is not the first time Google and SRP have worked together.

Sonoran Solar Energy Center, a 260 MW solar facility with a 1 gigawatt-hour battery energy storage system; Storey Energy Center, an 88 MW solar and battery energy storage system; and Babbitt Ranch Energy Center, a 161 MW wind farm, all support the energy needs of Google’s future data center in Mesa. Google’s current projections indicate these projects will help its Arizona operations reach at least 80% CFE on an hourly basis by 2026.

SRP has nearly 1,300 MW of energy storage currently supporting its grid, which includes 1,100 MW of battery storage—spanning eight facilities—and 200 MW of pumped hydro storage.

SRP is working to at least double the number of generating resources on its power system in the next 10 years to maintain top-tier reliability and resilience in the Phoenix metropolitan area.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS Google pumped hydro storage
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.