Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Just In » Tenova, in collaboration with GE Vernova, to supply the World’s Largest EAF to Nippon Steel’s Yawata
Just In

Tenova, in collaboration with GE Vernova, to supply the World’s Largest EAF to Nippon Steel’s Yawata

Shweta KumariBy Shweta KumariFebruary 6, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Tenova, in collaboration with GE Vernova

Tenova, a leading provider of sustainable solutions for the metals and mining industries, has been selected by Nippon Steel Corporation to supply a record-breaking Consteel® Electric Arc Furnace (EAF) for Nippon Steel’s Yawata Area at Kyushu Works. Tenova has teamed up with GE Vernova, whose Direct Feed system will power the EAF.

Once installed, the new furnace will become the world’s most powerful EAF with a heat size of 340 tons. This unprecedented power level will enable the use of high percentages of virgin iron units, which are essential for producing high-quality steel grades. GE Vernova will supply its Direct Feed power system, providing the high-stability power needed for such an advanced and unique installation.

The Yawata project is a landmark investment that combines innovation and sustainability and represents a crucial step in Nippon Steel’s pathway to carbon neutrality by 2050, shifting from blast furnace to EAF steelmaking in line with Japan’s Green Transformation (GX) Promotion Act and the company’s long-term decarbonization strategy.

“We are thrilled to collaborate once again with one of the world’s leading steelmakers, Nippon Steel,” stated Paolo Argenta, Tenova Executive Vice President, Upstream Business Unit. “This record-setting EAF is not only an engineering achievement, but it also embodies a shared commitment with GE Vernova to sustainability that defines the future of our industry.”

“We are proud to collaborate with Tenova and Nippon Steel on a project that represents the future of sustainable steel production,” said Ed Torres, Business Leader, Power Conversion & Storage, GE Vernova. “Our Direct Feed solution shows how advanced power technologies can support energy-intensive industries in operating more efficiently and reliably while accelerating their long-term decarbonization goals.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
electrification energy transition global news green transformation industrial decarbonisation Power Electronics
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Comments are closed.

Renewable energy
Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

July 20, 2026
Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

July 20, 2026
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
Batteries
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.