Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » Torrent Power Invites Bids for 200 MW Firm, Dispatchable Renewable Energy (FDRE) with Storage
Tenders

Torrent Power Invites Bids for 200 MW Firm, Dispatchable Renewable Energy (FDRE) with Storage

Shweta KumariBy Shweta KumariAugust 11, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
Torrent Power Floats 200 MW Renewable Storage Tender

Torrent Power Limited (TPL) has floated a Request for Selection (RfS) for the supply of 200 MW firm and dispatchable renewable energy (FDRE) from projects integrated with energy storage systems (ESS). The tender also includes a greenshoe option of up to 100 MW, allowing additional capacity procurement under the same terms.

The procurement will be conducted under a tariff-based competitive bidding process in line with TPL’s commitment to strengthen round-the-clock renewable power availability.

Tender Scope & Technology Eligibility

Under RfS No. TPL/FDRE/01/2025, the projects must deploy one or a combination of the following:

  • Solar photovoltaic systems
  • Wind power generating systems
  • Wind–solar hybrid systems

Any other renewable resource-based generation integrated with ESS

Both under-construction and commissioned projects without a long-term PPA are eligible, provided they are not tied under any other state or central schemes. The projects will be implemented on a Build-Own-Operate (BOO) basis at any location in India.

Contract Tenure & Tariff

TPL will sign a 25-year Power Purchase Agreement (PPA) with successful bidders from the project’s Scheduled Commercial Operation Date (SCOD).

The maximum tariff will remain fixed for the entire PPA duration, discovered through the e-bidding and e-reverse auction process.

Key Dates & Bidding Schedule

  • Tender Document Download: Aug 8, 2025 (1700 hrs) – Aug 30, 2025 (1600 hrs)
  • Pre-Bid Meeting: Aug 19, 2025, 1100 hrs (Virtual) – registration by Aug 18
  • Submission Deadline: Aug 30, 2025, 1700 hrs (Online + Physical documents at TPL Ahmedabad office)
  • Technical Bid Opening: Sept 1, 2025, 1000 hrs
  • Financial Bid Opening & e-Reverse Auction: Sept 3, 2025, from 1000 hrs onwards

Bid Fees & EMD

  • RfS Document Fee: ₹25,000 + 18% GST
  • Processing Fee: ₹3,00,000 + 18% GST
  • EMD: ₹20 lakh per MW

Payments can be made via DD/Pay Order in favour of Torrent Power Limited (payable at Ahmedabad) or via NEFT/RTGS to Bank of Baroda, Ashram Road branch.

Participation & e-Bidding Process

The bidding will be hosted on www.bharat-electronictender.com. Bidders must be registered on the portal as a “Supply Organization/Bidder” and pay applicable ETS fees before participating in the reverse auction.

Queries related to the RfS must be submitted by 5:00 PM on Aug 14, 2025 in the prescribed format (Annexure 5.11). Only two representatives from each bidder can attend the virtual pre-bid conference.

Additional Incentives & Benefits

Bidders can avail fiscal incentives such as Accelerated Depreciation, concessional duties, tax holidays, and carbon credit trading benefits. These will not influence bid evaluation as all participants are considered on equal terms.

Contact Details for Submission

Naimesh Shah
Vice President, Torrent Power Limited
Naranpura Zonal Office, Sola Road, Ahmedabad – 380013
Email: [email protected] | Tel: 079-27492222-5730

This tender is a significant step by TPL towards integrating large-scale renewable energy with storage to ensure reliability and grid stability, while providing bidders a long-term revenue opportunity in the evolving renewable sector.

Capacity Base Capacity: 200 MW firm and dispatchable renewable energy (FDRE) with energy storage system (ESS) +Greenshoe Option: Up to an additional 100 MW
Location Anywhere in India (projects can be set up at any location nationwide, with power supplied to Torrent Power’s distribution areas)
Last Date 30/08/2025
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
energy storage FDRE renewable energy Solar and Wind Torrent Power
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

MNRE Extends ALMM List-II Relief for Net-Metering and Open Access Solar Projects Till Dec. 31, 2026

MNRE Extends ALMM List-II Relief for Net-Metering and Open Access Solar Projects Till Dec. 31, 2026

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Comments are closed.

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.