Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Waaree Power Commissions 3.05 GW Solar Inverter Manufacturing Facility in Gujarat
Renewable energy

Waaree Power Commissions 3.05 GW Solar Inverter Manufacturing Facility in Gujarat

ManshiBy ManshiDecember 31, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Waaree Power Commissions 3.05 GW Solar Inverter Manufacturing Facility in Gujarat

Waaree Power, a wholly owned subsidiary of Waaree Energies Ltd, has commissioned two 1.525 GW solar inverter manufacturing lines, totaling 3.05 GW, at its Sarodhi-Valsad facility in Gujarat. The facility commenced commercial operations on December 29, 2025, at 10 a.m., the company informed stock exchanges in a regulatory filing under SEBI Listing Obligations.

The new lines will manufacture both single-phase and three-phase on-grid inverters, supporting the growing demand for domestic inverter solutions. The manufacturing unit is housed within the existing Waaree Power factory premises. The expansion is expected to strengthen Waaree’s position in the domestic solar equipment market and further enhance its renewable energy value chain capabilities.

India Solar Market Leaderboard 2025, string inverters now account for 51.3% of total inverter supply, surpassing central inverters, which declined by 55.2% from 2023. In line with government guidelines, the Ministry of New and Renewable Energy mandated domestic inverter manufacturers supplying under the PM Surya Ghar: Muft Bijli Yojana to integrate inverter communication devices with the PM Surya Ghar portal, highlighting the need for secure and local inverter solutions.

Waaree Energies’ offerings include solar modules, battery energy storage systems, and electrolyzer stacks. In December 2025, the company also commissioned 1.5 GW of high-efficiency N-type module manufacturing lines at its Samakhiali, Kutch plant, bringing its total global module manufacturing capacity to 22.3 GW (19.7 GW in India and 2.6 GW in the U.S.).

To strengthen its polysilicon supply chain, Waaree Solar Americas announced the acquisition of 53,68,551 Series B shares of United Solar Holding for $30 million. Additionally, Waaree Energy Storage Systems secured funding to scale battery cell and containerized energy storage manufacturing across India and select international markets.

Rajesh Ghanshyam Gaur, Company Secretary and Compliance Officer, said in the filing, “The commissioning of the Sarodhi-Valsad facility marks a key milestone in expanding Waaree’s manufacturing capabilities across the renewable energy value chain.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage systems India News renewable energy solar modules supply chain
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

Comments are closed.

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.