Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » ACME Solar Crosses 2 GWh BESS Milestone in Rajasthan, Targets 10 GWh by 2027
Batteries

ACME Solar Crosses 2 GWh BESS Milestone in Rajasthan, Targets 10 GWh by 2027

ManshiBy ManshiApril 22, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
ACME Solar Crosses 2 GWh BESS Milestone in Rajasthan, Targets 10 GWh by 2027

ACME Solar Holdings Ltd has achieved a significant milestone by cumulatively operationalising over 2 GWh of Battery Energy Storage System (BESS) capacity in Rajasthan, positioning itself among the early leaders in large-scale energy storage deployment in India.

The company, which is based in Gurugram, announced that its total operational BESS capacity across its subsidiaries in the state is now 591.18 MW / 2031.24 MWh. This is a big step in the company’s plan to grow its energy storage infrastructure, with the goal of reaching 10 GWh of BESS capacity by 2027.

Strengthening Grid Stability Through Storage

The deployed BESS projects are designed to enhance grid efficiency by:

  • Charging batteries when there isn’t much demand
  • Letting power out during times of high demand

This approach supports better energy management and improves grid reliability, particularly with increasing renewable energy integration.

Portfolio Strength and Growth Pipeline

ACME Solar operates a diversified renewable energy portfolio of 8,071 MW, covering:

  • Solar
  • Wind
  • Hybrid solutions
  • Firm and Dispatchable Renewable Energy (FDRE)
  • Energy storage systems

The company currently has a contracted capacity of 2,990 MW and is building more capacity that will bring its total to 5,081 MW, including about 15 GWh of planned BESS installations.

ACME Solar  continues to use its own engineering, procurement, construction (EPC), and operations and maintenance (O&M) skills to carry out projects from start to finish and keep its growing asset base running smoothly.

Market Performance and Investor Outlook

Following the announcement, the company’s shares rose 1.65% to ₹301.15, compared to the previous close of ₹296.25, with an intraday high of ₹304.45. The stock has gained over 22% in the past month and nearly 27% year-to-date, outperforming the Nifty 500, which declined by around 4% during the same period. The company’s market capitalisation currently stands at approximately ₹18,255 crore.

With its growing storage capacity and strong project pipeline, ACME Solar is reinforcing its position as an integrated renewable energy developer. The milestone reflects the company’s commitment to advancing energy storage adoption while supporting India’s transition toward a more reliable and sustainable power ecosystem.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS BESS projects energy storage energy storage infrastructure energy storage systems EPC India News renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Leave A Reply Cancel Reply

seventeen − 3 =

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.