Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » KPI Green Energy Subsidiary Signs BESPA with GUVNL for 445 MW / 890 MWh BESS Projects in Gujarat
Batteries

KPI Green Energy Subsidiary Signs BESPA with GUVNL for 445 MW / 890 MWh BESS Projects in Gujarat

ManshiBy ManshiMarch 9, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
KPI Green Energy Subsidiary Signs BESPA with GUVNL for 445 MW / 890 MWh BESS Projects in Gujarat

KPI Green Energy Limited has announced that its subsidiary, Sun Drops Energia Limited, has signed a Battery Energy Storage Purchase Agreement (BESPA) with Gujarat Urja Vikas Nigam Limited (GUVNL) for the development of 445 MW / 890 MWh standalone Battery Energy Storage System (BESS) projects in Gujarat.

The company disclosed the development through a regulatory filing with BSE Limited and the National Stock Exchange of India.

Large-Scale Battery Storage Projects in Gujarat

According to the deal, Sun Drops Energia Limited will build, own, and run the standalone battery energy storage systems in several places in Gujarat. The projects will have a total capacity of 445 MW / 890 MWh, and the company will provide GUVNL with contracted battery storage capacity for a long time.

Battery energy storage systems play an important role in improving grid stability and supporting the integration of renewable energy by storing surplus electricity and releasing it during periods of high demand.

Award Through Competitive Bidding

The BESPA was secured through a tariff-based competitive bidding process conducted by GUVNL under Phase VII for procuring standalone battery storage capacity.

The Power System Development Fund (PSDF) gives Viability Gap Funding (VGF) to help the project. The goal is to help the country build more large-scale energy storage systems.

Entry into Utility-Scale Energy Storage

According to the company, signing the BESPA marks a significant milestone as KPI Green Energy moves into the implementation phase of its first utility-scale Independent Power Producer (IPP) battery energy storage project.

The company’s strategy is to grow into new areas of the renewable energy sector, especially energy storage solutions that help renewable power integration.

Key Takeaways

  • Marks KPI Green Energy’s entry into utility-scale IPP BESS projects
  • Strengthens the company’s presence in the energy storage segment
  • Supports renewable energy integration and grid reliability

Strengthening Energy Storage in India

As India builds more renewable energy capacity, big battery storage projects are becoming more and more important. BESS projects help make energy more reliable and the grid more efficient by letting people store and use electricity from renewable sources in a flexible way.

With this agreement, KPI Green Energy is taking a major step toward supporting the growth of energy storage infrastructure in Gujarat while contributing to the broader development of India’s renewable energy ecosystem.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Battery Energy Storage System BESPA BESS projects energy storage systems GUVNL India News KPI Green Energy renewable energy Sun Drops Energia Limited
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Leave A Reply Cancel Reply

nineteen − eight =

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.