Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » AmpereHour Energy and IndiGrid Commission India’s First Large-Scale Standalone BESS Project in Gujarat
Batteries

AmpereHour Energy and IndiGrid Commission India’s First Large-Scale Standalone BESS Project in Gujarat

PrakashBy PrakashMay 19, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
AmpereHour Energy and IndiGrid Commission India’s First Large-Scale Standalone BESS Project in Gujarat

AmpereHour Energy and IndiGrid have commissioned a 180 MW / 360 MWh Battery Energy Storage System (BESS) at the Gujarat Energy Transmission Corporation (GETCO) substation in Gujarat. With Gujarat Urja Vikas Nigam Limited (GUVNL) as the off-taker, this project is the largest standalone utility-scale battery energy storage (BESS) installation in India and stands amongst the largest BESS capacities in Asia.

The commissioning of this project has significantly strengthened the regional energy landscape. Over the last few years, Gujarat has emerged as a frontrunner in the renewable energy sector, having launched a collective 870 MW of battery storage capacity projects state-wide. Within this ambitious ecosystem, this IndiGrid-AmpereHour project stands out as a lighthouse for standalone storage, demonstrating how technology can stabilise the grid and ensure a 24/7 renewable energy supply.

Building one of Asia’s largest standalone BESS was a mammoth task that required AmpereHour to scale the learnings from its 40 MWh Delhi project into a massive 360 MWh reality. To meet GUVNL’s stringent grid requirements, AmpereHour’s R&D and engineering teams conducted advanced simulation studies to optimise the entire electrical chain – right from the 220 kV grid connection down to the DC systems, ensuring high Round Trip Efficiency (RTE) and usable energy.

The project utilised AmpereHour’s ELINA EMS to integrate massive data streams and the AH Suite software platform to maintain high-quality execution across multiple contractors. From “boots on the ground” quality audits to navigating complex international logistics, AmpereHour’s scientific approach and “First Time Right” principle culminated in a flawless, one-go commissioning.

“This project is a ‘lighthouse’ moment for the Indian energy sector,” said Rahul Shelke, Co-Founder & MD of AmpereHour Energy. “Our Flexible Integration architecture was the key to this scale; by providing an intelligent, adaptable technology layer, we enabled IndiGrid to deploy a system that is technically superior and commercially optimised. As Gujarat continues to expand its energy storage footprint, we are excited to showcase how our technology serves as the backbone for such critical infrastructure.”

As the project developer, IndiGrid has set a new benchmark for utility-scale storage infrastructure in India. This BESS facility will store excess renewable energy during off-peak hours and discharge it during periods of high demand, reducing curtailment and providing essential grid resilience.

“The successful commissioning of this 180 MW / 360 MWh BESS project was a proud moment for IndiGrid and marks an important milestone for India’s evolving energy infrastructure,” said Harsh Shah, Managing Director of IndiGrid. AmpereHour’s ability to design, integrate, and energise a complex Battery Energy Storage System at scale was key to the success of this project. This is a critical asset that underscores our commitment to supporting India’s goal of 500 GW of non-fossil fuel capacity by 2030.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
AmpereHour Energy BESS project India News IndiGrid renewable energy
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

Leave A Reply Cancel Reply

10 + 1 =

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.