Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » ReNew Breaks Ground on ₹5,400 Crore Solar Ingot-Wafer Facility in Andhra Pradesh
Renewable energy

ReNew Breaks Ground on ₹5,400 Crore Solar Ingot-Wafer Facility in Andhra Pradesh

ManshiBy ManshiApril 22, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
Andhra Pradesh host mega solar manufacturing facility by ReNew

In a significant stride towards India’s clean energy ambitions and self-reliance goals, Andhra Pradesh is set to host the groundbreaking ceremony of a mega solar manufacturing facility by ReNew, a NASDAQ listed renewable energy company in Anakapalli district near Visakhapatnam on April 23.

This landmark project comes at a crucial time as India accelerates towards its ambitious renewable energy targets – aiming for 500 GW of non-fossil fuel capacity by 2030 – while simultaneously reducing import dependence and strengthening domestic manufacturing under the vision of Atmanirbhar Bharat.

At the forefront of this transformation is Andhra Pradesh’s Integrated Clean Energy Policy 2024, a forward-looking framework designed to attract large-scale investments, enable backward integration in manufacturing, and position the state as a global clean energy hub. The policy has already begun translating vision into action, with projects like ReNew’s setting new benchmarks in scale and impact.

The upcoming facility – a 6 GW solar ingot and wafer manufacturing unit – represents an investment of approximately ₹5,400 crore and is a key step in building a resilient domestic solar supply chain. By manufacturing critical upstream components such as ingots and wafers, the project will significantly reduce reliance on imports and strengthen India’s energy security.

ReNew Solar Facility project is also part of its broader ₹82,000 crore investment commitment in Andhra Pradesh, announced earlier, underscoring strong investor confidence in the state’s policy ecosystem and governance.

Once operational, the solar manufacturing facility is expected to be commissioned within 24 months and generate over 2,100 direct and indirect jobs, further boosting industrial growth and employment in the region.

Hon’ble Chief Minister Shri N. Chandrababu Naidu will lay the foundation stone at the project site in the presence of senior leadership from ReNew, including Founder, Chairman & CEO Sumant Sinha, along with public representatives and industry stakeholders.

A Strategic Moment for India and Andhra Pradesh

This project exemplifies the convergence of national priorities and state-led execution:

• Advancing India’s renewable energy targets

• Enabling domestic manufacturing and backward integration

• Reducing import dependence in the solar value chain

• Creating jobs and driving regional economic growth

With its progressive policy framework, robust infrastructure, and proactive governance, Andhra Pradesh continues to emerge as a preferred destination for global clean energy investments.

As the state moves from policy to execution, the April 23 groundbreaking marks not just the launch of a project – but the strengthening of India’s journey towards a sustainable, self-reliant energy future.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy ecosystem India News renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Leave A Reply Cancel Reply

one × one =

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.