Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » EV & Automotive » BikeWo Strengthens Commerce Forever Partnership to Advance Energy & Mobility Strategy
EV & Automotive

BikeWo Strengthens Commerce Forever Partnership to Advance Energy & Mobility Strategy

Shivangi GuptaBy Shivangi GuptaSeptember 7, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
BikeWo Strengthens Commerce Forever Partnership

BikeWo Green Tech Limited (BikeWo) is strengthening its existing strategic partnership with Commerce Forever as part of its broader strategy to develop an integrated Energy & Mobility Infrastructure (EMI) platform.
BikeWo and Commerce Forever had entered into a strategic Memorandum of Understanding in June 2025, envisaging the deployment of approximately 1,500–2,500 electric two-wheelers for last-mile delivery operations across Delhi NCR, Haryana, Uttar Pradesh and adjoining regions.
The partnership was originally conceived around electric vehicle deployment and last-mile logistics. With BikeWo now building broader capabilities across EV fleet operations, vehicle leasing, logistics and supporting infrastructure, the Company sees the Commerce Forever opportunity as closely aligned with its evolving EMI strategy.
The potential scale of the partnership is particularly relevant to BikeWo’s operating model. A fleet of up to 2,500 vehicles can provide opportunities to build economies of scale across vehicle procurement, financing, insurance, charging, maintenance and fleet management, while improving asset utilization and overall operating efficiency.
Under the existing framework, the partnership covers EV deployment, rider onboarding, technology-enabled fleet management, route management and operational support for Commerce Forever’s B2B e-commerce supply chain ecosystem.
BikeWo is also evaluating strategic opportunities that could strengthen its regional execution capabilities, including its ongoing evaluation of Delhi-based PositiEV Mobility, which could complement the operating requirements of large fleet deployments in North India.
The Company intends to pursue the Commerce Forever opportunity in a phased manner, with future deployments aligned to underlying demand, unit economics, commercial viability and capital allocation priorities.
Commenting on the development, Hiten Pal Saklani, Chief Executive Officer of BikeWo Green Tech Limited, said: “Commerce Forever represents an important opportunity within our broader Energy & Mobility Infrastructure strategy.
The potential scale of up to 2,500 electric two-wheelers gives us an opportunity to build greater operating efficiencies across procurement, financing, maintenance and fleet operations. As we strengthen the wider BikeWo platform, our focus will be on converting such opportunities into scalable and commercially sustainable operations.”
Any definitive agreements, commercial arrangements or other material developments arising from the Commerce Forever partnership will be disclosed separately, as and when they are concluded, in accordance with applicable regulatory requirements.
BikeWo Green Tech Limited is building an integrated mobility and logistics platform with capabilities spanning electric mobility, fleet operations, logistics infrastructure, and technology. The Company is pursuing strategic acquisitions, investments and collaborations to participate across multiple layers of India’s evolving mobility and logistics value chain.
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BikeWo Green Tech Commerce Forever electric mobility Energy & Mobility Infrastructure green technology India News
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

EDF Power Solutions India Appoints Vineet Taneja as Head – Business

EDF Power Solutions India Appoints Vineet Taneja as Head – Business Development & Commercials, Renewables

OSCAL Highlights Smart Devices and Energy Solutions at LEAP and MEE 2026

OSCAL Highlights Smart Devices and Energy Solutions at LEAP and MEE 2026

Shakeel Chouhan Elevated to Vice President – Projects at Adani Green Energy

Shakeel Chouhan Elevated to Vice President – Projects at Adani Green Energy

Leave A Reply Cancel Reply

thirteen − 10 =

Renewable energy
EDF Power Solutions India Appoints Vineet Taneja as Head – Business

EDF Power Solutions India Appoints Vineet Taneja as Head – Business Development & Commercials, Renewables

September 7, 2026
OSCAL Highlights Smart Devices and Energy Solutions at LEAP and MEE 2026

OSCAL Highlights Smart Devices and Energy Solutions at LEAP and MEE 2026

September 7, 2026
Shakeel Chouhan Elevated to Vice President – Projects at Adani Green Energy

Shakeel Chouhan Elevated to Vice President – Projects at Adani Green Energy

September 7, 2026
Sungrow, UNSW Launch AI-Powered Community Energy Project in NSW

Sungrow, UNSW Launch AI-Powered Community Energy Project in NSW

September 7, 2026
Batteries
China Temporarily Suspends Approvals for New Battery Storage Factories

China Temporarily Suspends Approvals for New Battery Storage Factories

September 7, 2026
Kalpa Power Assigns Kamlesh Kataria as Chief Growth Officer

Kalpa Power Assigns Kamlesh Kataria as Chief Growth Officer

September 7, 2026
Powertrac Orders 10 GWh AI-Driven Robotic BESS Manufacturing

Powertrac Orders 10 GWh AI-Driven Robotic BESS Manufacturing Line in Gujarat

September 7, 2026
Equinor Brings Largest US Energy Storage Project

Equinor Brings Largest US Energy Storage Project Online

September 6, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.