Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » DMRC Invites Bids for 500 MU Renewable Power Supply With Co-Located BESS
Tenders

DMRC Invites Bids for 500 MU Renewable Power Supply With Co-Located BESS

Shivangi GuptaBy Shivangi GuptaNovember 23, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
DMRC Invites Bids for 500 MU Renewable Power Supply With Co-Located BESS

Delhi Metro Rail Corporation (DMRC) has invited bids for procuring renewable energy from an Inter-State Transmission System (ISTS)-connected solar power project integrated with a co-located Battery Energy Storage System (BESS). The project aims to supply renewable electricity to DMRC across Delhi and the National Capital Region (NCR), supporting its efforts to increase clean energy use across metro operations.

The selected developer will be required to establish a grid-connected captive generating plant with co-located battery storage anywhere in India and supply power to DMRC under a long-term power procurement arrangement.

Key Tender Details

  • Annual Power Procurement: 500 million units (MU) of renewable energy.

  • Project Configuration: Grid-connected renewable energy plant with co-located BESS.

  • Project Location: Anywhere in India.

  • Offtaker: DMRC, Delhi and NCR.

  • PPA Duration: 25 years.

  • Project Completion Timeline: 15 months from the date of award.

The project is expected to help DMRC increase renewable energy’s share in its total electricity consumption from around 33% to more than 60%, including the anticipated demand from its Phase-IV network.

Renewable Energy Expansion Plans

DMRC currently procures around 350 MU of electricity annually from the Rewa Solar Park and generates approximately 40 MU through rooftop solar installations. Renewable energy sources reportedly meet nearly 65% of its daytime electricity demand.

The proposed procurement combines renewable energy generation with battery storage, allowing electricity to be stored and supplied according to demand requirements. The co-located BESS is expected to support power availability beyond solar generation hours and improve the integration of renewable energy into metro operations.

The 25-year PPA provides a long-term procurement framework for the selected developer, while the 15-month project completion timeline sets the execution window for developing the generating facility and associated storage infrastructure.

The tender presents an opportunity for renewable energy developers and energy storage companies to participate in supplying clean power to one of India’s major urban transit networks. The integration of solar generation and battery storage also reflects the growing demand for firm renewable energy solutions among large electricity consumers.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Battery Energy Storage System DMRC Tender India News ISTS Connected Project renewable energy Solar Power
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Smarten Power Systems Develops Indigenous 3kW On-Grid Solar Inverter With HERIC Technology

Smarten Power Systems Develops Indigenous 3kW On-Grid Solar Inverter With HERIC Technology

National Wealth Fund, Matrix Renewables Partner on 1 GW Battery Storage Projects in Scotland

National Wealth Fund, Matrix Renewables Partner on 1 GW Battery Storage Projects in Scotland

APTRANSCO Floats Tender for 1,000 MW/4,000 MWh Standalone BESS Projects in Andhra Pradesh

APTRANSCO Floats Tender for 1,000 MW/4,000 MWh Standalone BESS Projects in Andhra Pradesh

Leave A Reply Cancel Reply

11 + twenty =

Renewable energy
Smarten Power Systems Develops Indigenous 3kW On-Grid Solar Inverter With HERIC Technology

Smarten Power Systems Develops Indigenous 3kW On-Grid Solar Inverter With HERIC Technology

November 23, 2026
Sterling and Wilson Renewable Energy Secures ₹2,050 Crore Orders, Including 600 MWh BESS Project

Sterling and Wilson Renewable Energy Secures ₹2,050 Crore Orders, Including 600 MWh BESS Project

November 23, 2026
CESC Commissions 147 MW of 150 MW Solar Project in Rajasthan

CESC Commissions 147 MW of 150 MW Solar Project in Rajasthan

November 23, 2026
Adani Energy Solutions Secures 2,500 MW RE-RTC Power Supply Award From WBSEDCL

Adani Energy Solutions Secures 2,500 MW RE-RTC Power Supply Award From WBSEDCL

November 23, 2026
Batteries
National Wealth Fund, Matrix Renewables Partner on 1 GW Battery Storage Projects in Scotland

National Wealth Fund, Matrix Renewables Partner on 1 GW Battery Storage Projects in Scotland

November 23, 2026
APTRANSCO Floats Tender for 1,000 MW/4,000 MWh Standalone BESS Projects in Andhra Pradesh

APTRANSCO Floats Tender for 1,000 MW/4,000 MWh Standalone BESS Projects in Andhra Pradesh

November 23, 2026
DMRC Invites Bids for 500 MU Renewable Power Supply With Co-Located BESS

DMRC Invites Bids for 500 MU Renewable Power Supply With Co-Located BESS

November 23, 2026
HiTHIUM Unveils Integrated C&I Microgrid Solution Featuring 1,022 kWh Energy Storage System

HiTHIUM Unveils Integrated C&I Microgrid Solution Featuring 1,022 kWh Energy Storage System

November 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.