Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Edify Energy Launches 185MW / 370MWh Koorangie Battery to Boost Grid Stability in Victoria
Batteries

Edify Energy Launches 185MW / 370MWh Koorangie Battery to Boost Grid Stability in Victoria

PrakashBy PrakashJuly 23, 20254 Mins Read
Facebook Twitter LinkedIn WhatsApp
Edify Energy’s 185MW / 370 MWh Koorangie Battery Is Now Fully Operational, Strengthening Victoria’s Grid and Enabling More Renewables.

Edify Energy has announced the Koorangie Energy Storage System (KESS) is now fully operational, importing and exporting electricity at its full nameplate capacity to the National Electricity Market (NEM). Located in the Gannawarra region of northwest Victoria, the advanced battery system delivers cleaner, more reliable energy to Victorian consumers.

  • 185 MW / 370 MWh of large-scale energy storage
  • Developed, designed and delivered by Edify Energy
  • Constructed by Consolidated Power Projects (CPP)
  • 100 Tesla Megapacks storing enough energy to power 350,000 homes for two hours
  • Owned by Sosteneo SGR Spa on behalf of its clients
  • 20-year System Support Agreement with the Australian Energy Market Operator (AEMO)
  • 15-year offtake agreement with Shell Energy
  • Brings together CBA, DNB and BNP Paribas in the provision of a long-term syndicated debt facility
  • Over 520 jobs during peak construction

This landmark asset demonstrates the strength of collaboration in advancing Australia’s energy transition. Through its System Support Agreement with AEMO, KESS provides essential grid stability services and enables up to 300 MW of new renewable generation in the Murray River Renewable Energy Zone (REZ). The long-term offtake agreement advances Shell Energy’s commitment to operational excellence and their investment in firming assets that play a critical role in supporting Australia’s decarbonization and net-zero future.

Developed and delivered by Edify in partnership with world-class contractors, the project supported over 520 construction jobs and 4 full-time operations staff. It is Edify’s third major development in Kerang and the company’s 12th utility-scale energy infrastructure project.

Local engagement with the Kerang community and Gannawarra Shire Council was central to the project’s planning and delivery. The development aligns with the region’s strong commitment to renewable energy, offering long-term community and economic benefits, including lower energy costs, job creation, and local business growth.

Despite its rich wind and solar resources, northwest Victoria has faced grid constraints that limit renewable energy exports. KESS addresses these challenges using Megapacks with Tesla grid-forming inverters, which maintain grid voltage and frequency—services traditionally provided by conventional generators. This technology plays a vital role in stabilizing the network and unlocking the region’s full renewable energy potential.

“This system seamlessly delivers critical system strength services to AEMO while dispatching clean, green electrons to the grid. It’s a powerful example of how advanced grid-forming inverter and battery storage technologies can combine to solve some of the most complex challenges in Australia’s energy transition. KESS is our third project in Kerang and our 12th major energy infrastructure development to reach commercial operation —an achievement that reflects the dedication, expertise, and resilience of the Edify team.

We build long-term partnerships with industry, investors, government and communities, and KESS exemplifies our commitment to delivering projects that accelerate Australia’s energy transition to a low-carbon electricity system.”

– Quote attributable to John Cole, Executive Chairman, Edify Energy.

“This project is a great example of the Victorian Government partnering with energy industry leaders to deliver the infrastructure we need for the transition to clean and affordable renewable energy.”

“We are proud of our role in this project, securing the system strength component of this advanced storage system, which will allow more renewables to connect to the grid in Victoria’s Northwest.”

“Our partnership with KESS is part of a $480 million program to strengthen and modernize the grid so more renewable energy can flow to homes and businesses.”

– Quotes attributable to Lily D’Ambrosio MP, Minister for Energy and Resources.

The Koorangie Energy Storage System is on the traditional land of the Barapa Barapa, Wamba Wamba and Yorta Yorta people, near the town of Kerang. Edify acknowledges the traditional custodians of this land, whose rich culture is deeply connected to the rivers, lagoons, creeks, and wetlands of their nation.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS lower energy costs
Prakash
  • Website
  • LinkedIn

I am a Junior Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

NGEL Floats Tender for 3,200 MWh Battery Storage Project in Rajasthan

NGEL Floats Tender for 3,200 MWh Battery Storage Project in Rajasthan

NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Comments are closed.

Renewable energy
PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

June 4, 2026
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.