Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Solar » Fujiyama Power Systems Commissions 2,000 MW Solar Panel Manufacturing Facility Line
Solar

Fujiyama Power Systems Commissions 2,000 MW Solar Panel Manufacturing Facility Line

Shweta KumariBy Shweta KumariMay 15, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Fujiyama Power Systems Commissions 2,000 MW Solar Panel Manufacturing Facility Line

Fujiyama Power Systems Limited has announced the successful commissioning of its 2,000 MW solar panel manufacturing facility at Ratlam, Madhya Pradesh. Fujiyama is one of India’s leading providers of rooftop solar solutions, offering an extensive portfolio across solar panels, inverters, lithium and tubular batteries, chargers and power-electronics systems.

In order to improve the company’s integrated solar production capabilities, Fujiyama is developing a large-scale greenfield manufacturing expansion project that includes the Ratlam site. The factory is designed to produce solar panels, batteries, and inverters at a proposed capacity of 2,000 MW each.

The plant will initially operate at an annualized capacity of approximately 1,000 MW under a single-shift operation, with gradual ramp-up planned in phases. Furthermore, it is expected to be gradually ramped-up through double shifts operations to achieve full capacity utilization by Q4FY27.

With the commissioning of the Ratlam solar panel manufacturing facility, Fujiyama’s total solar panel manufacturing capacity has increased to 3,568 MW.

At the same facility, the commissioning timelines for the power electronics and battery manufacturing capacities experienced certain delays as the Company incorporated the latest advancements in lithium-ion battery technology to ensure that its products remain relevant and competitive in the evolving market. In addition, certain geopolitical developments impacted supply timelines during the execution phase.

With these factors now largely addressed, the inverter manufacturing line is expected to be commissioned in the first quarter of FY27 and the requisite machinery has already been received at the facility. Further, machinery orders for the battery manufacturing line have been placed and commissioning is expected in the second quarter of FY27.

The Ratlam Solar panel Manufacturing plant expansion further strengthens Fujiyama as one of the leading solar solution provider and supports the Company’s long-term strategy of increasing backward integration, improving supply-chain efficiencies and expanding manufacturing scale.

Commenting on the commissioning, Chairman and Joint Managing Director, Pawan Kumar Garg said:

“The commissioning of our solar panel manufacturing facility at Ratlam marks an important milestone in Fujiyama’s growth journey and manufacturing expansion strategy. This greenfield project strengthens our ability to serve the rapidly growing domestic rooftop solar market with higher manufacturing scale, improved operational efficiencies and greater control across the value chain.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery manufacturing India News Inverters solar panel manufacturing
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Leave A Reply Cancel Reply

16 − 6 =

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.