Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » GameChange Solar to Supply Trackers for 258 MWp Benban Project
Renewable energy

GameChange Solar to Supply Trackers for 258 MWp Benban Project

ManshiBy ManshiMarch 16, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
GameChange Solar to Supply Trackers for 258 MWp Benban Project

GameChange Solar has signed a contract with Hassan Allam Construction to supply its Genius Tracker™ solar tracking system for a 258 MWp solar project in Benban, Egypt. The project is being developed by Infinity Power, while Hassan Allam Construction will serve as the engineering, procurement, and construction (EPC) contractor.

The tracker system to be delivered uses a 1R × 4 string architecture, designed to fit the project’s terrain and civil engineering needs. This order marks GameChange Solar’s fourth project in Egypt, bringing its total installed capacity in the country to more than 3 GWp.

Designed for Tough Conditions

The solar plant is part of the Benban Solar Park, which is one of the biggest solar parks in the area. The project site faces high temperatures and dusty conditions, typical of the Middle East and North Africa (MENA) region. GameChange Solar said its selection was based on its previous project experience in Egypt, strong regional support network, and ability to meet fast delivery timelines.

Anirudha Sharma, Vice President – Business Development for India, MENA, and CIS at GameChange Solar, said, “The project represents an important milestone for the company’s regional growth strategy. We have expanded our on-ground capabilities across the MENA region, and this order raises our cumulative installed capacity in the region to approximately 6.7 GWp.”

Hybrid Energy and National Goals

The Benban project will combine 200 MW of solar generation with a 120 MWh battery energy storage system, creating a hybrid renewable energy facility to enhance grid reliability. This development also supports Egypt’s national energy transition targets, aiming for 42% renewable energy by 2030 and 65% by 2040.

Hany Fayed, Managing Director of Hassan Allam Constructions, said, “Large-scale projects such as Benban require careful coordination and disciplined execution across partners. We value partners capable of providing strong technical support and maintaining project timelines as construction progresses.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Battery Energy Storage System EPC GameChange Solar global news renewable energy solar project
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Leave A Reply Cancel Reply

nine + twenty =

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.