Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Grid » GE Vernova Wins 6 GW HVDC Transmission Project from PowerGrid India
Grid

GE Vernova Wins 6 GW HVDC Transmission Project from PowerGrid India

Shivangi GuptaBy Shivangi GuptaNovember 11, 20264 Mins Read
Facebook Twitter LinkedIn WhatsApp
GE Vernova Wins 6 GW HVDC Transmission Project from PowerGrid India

GE Vernova has been selected by PowerGrid Corporation of India Limited (PGCIL) to deliver a 6 GW high-voltage direct current (HVDC) transmission corridor to support India’s energy transition. The project was booked in the fourth quarter of 2026, the company announced.

This project will serve as a vital energy highway, enabling the efficient transport of 6 GW of power from the renewable energy-rich region of Barmer, Rajasthan, to the load center in South Kalamb.

By connecting remote renewable energy zones to the national network, this 800 kV project aims to provide the infrastructure needed to stabilize power flow for millions of homes and businesses. As India’s electricity demand continues to grow, this high-capacity link is essential to ensuring that the country’s grid remains reliable and resilient while supporting its decarbonization goals.

“India is at the forefront of the global energy transition, characterized by an unprecedented scale of renewable integration and rapidly evolving grid requirements,” said Philippe Piron, President and CEO of GE Vernova’s Electrification Segment. “This project represents more than just transmission capacity; it is an investment in the reliability and future-proofing of India’s power system. We are proud to work with PGCIL to deploy the advanced technology required to bridge the gap between renewable energy production and national consumption, ensuring long-term system performance.”

“As India accelerates its renewable energy journey, the development of robust, high-capacity transmission infrastructure is paramount,” said Sandeep Zanzaria, CEO & Managing Director at GE Vernova, T&D India. “The Barmer–South Kalamb HVDC corridor is a strategic project for PGCIL, designed to efficiently integrate large-scale renewable capacity from Rajasthan into the national grid. By leveraging advanced transmission technologies, we are strengthening the backbone of India’s power system, ensuring reliable, high-quality electricity reaches consumers across the country while supporting our national commitment to a sustainable and resilient energy future.”

GE Vernova will deliver the complete design for the ±800 kV, 6,000 MW (2×3000 MW) bipolar HVDC link between Barmer II and South Kalamb. The project scope encompasses the creation of new converter stations, the supply of all major equipment, and the full management of site erection, testing, and commissioning. By overseeing the end-to-end delivery of this link, GE Vernova ensures a synchronized approach that prioritizes grid stability and system efficiency, suitable for large scale renewable energy links such as Barmer.

The project will feature GE Vernova’s most advanced LCC (Line Commutated Converter) valve, which will be manufactured at the Pallavaram factory in India. It will also include the eLumina control system which provides the digital intelligence required to manage complex power flows, enabling the grid to respond dynamically to changing conditions.

This collaboration further strengthens GE Vernova’s long-standing relationship with PGCIL, reinforcing a shared vision of a modernized, resilient, and decarbonized power grid for the future.

GE Vernova Inc. is a purpose-built global energy company that includes Power, Electrification and Wind segments and is supported by its accelerator businesses. Building on over 130 years of experience tackling the world’s challenges, GE Vernova is uniquely positioned to help lead the energy transition by continuing to electrify the world while simultaneously working to decarbonize it. GE Vernova helps customers power economies and deliver electricity that is vital to health, safety, security, and improved quality of life. GE Vernova is headquartered in Cambridge, Massachusetts, U.S., with approximately 85,000 employees across approximately 100 countries around the world. Supported by the Company’s purpose, The Energy to Change the World, GE Vernova technology helps deliver a more affordable, reliable, sustainable, and secure energy future.

GE Vernova’s Electrification segment includes Grid Solutions, Power Conversion & Storage — collectively referred to as Electrification Systems — and digital technologies, referred to as Electrification Software. The solutions offered by this segment are essential for the transmission, distribution, conversion, storage, and orchestration of electricity from point of generation to point of consumption.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
GE Vernova HVDC Transmission India energy transition India News Power Transmission PowerGrid India
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Oyster Commissions Solar Capacity in Laurus Labs Hybrid Project

Oyster Renewable Commissions 39.3 MWp Solar Project for Laurus Labs Under ₹372 Crore Hybrid Development

Power Ministry Allows Intra-State Connectivity for ISTS-Tendered Renewable Energy Projects

Power Ministry Allows Intra-State Connectivity for ISTS-Tendered Renewable Energy Projects

Advait Greenergy Appoints Darshan Soni as CEO for Green Hydrogen, Solar and Fuel Cell Businesses

Advait Greenergy Appoints Darshan Soni as CEO for Green Hydrogen, Solar and Fuel Cell Businesses

Leave A Reply Cancel Reply

4 + seven =

Renewable energy
Oyster Commissions Solar Capacity in Laurus Labs Hybrid Project

Oyster Renewable Commissions 39.3 MWp Solar Project for Laurus Labs Under ₹372 Crore Hybrid Development

November 12, 2026
Advait Greenergy Appoints Darshan Soni as CEO for Green Hydrogen, Solar and Fuel Cell Businesses

Advait Greenergy Appoints Darshan Soni as CEO for Green Hydrogen, Solar and Fuel Cell Businesses

November 12, 2026
Tata Power Posts Record Q2 Profit on Clean Energy Growth

Tata Power Reports Record ₹1,652 Crore Q2 Profit as Solar Manufacturing and Renewables Drive Growth

November 12, 2026
ReNew Announces rs 29,500 Crore Clean Energy Investment in AP

ReNew Pledges ₹29,500 Crore for Pumped Storage, Green Ammonia Projects in Andhra Pradesh

November 12, 2026
Batteries
TACC Secures ₹609.50 Crore ECMS Incentive for Synthetic Graphite Anode Manufacturing

HEG Subsidiary TACC Secures ₹609.50 Crore ECMS Incentive for Synthetic Graphite Anode Manufacturing

November 12, 2026
Pai Kane Energy And Gooree Sign 5 GWh BESS Cooperation Agreement For India

Pai Kane Energy And Gooree Sign 5 GWh BESS Cooperation Agreement For India

November 12, 2026
Raymond Produces 2,500th Lithium-Ion Battery, Expands Focus On Recycling And Second-Life Applications

Raymond Produces 2,500th Lithium-Ion Battery, Expands Focus On Recycling And Second-Life Applications

November 11, 2026
Ampace To Showcase PU200 UPS Battery Solution At Data Centre World Paris 2026

Ampace To Showcase PU200 UPS Battery Solution At Data Centre World Paris 2026

November 11, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.