Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Hydropower » GE Vernova Secures India’s Largest Pumped-Storage Order for 1.35 GW Upper Sileru Hydropower Plant
Hydropower

GE Vernova Secures India’s Largest Pumped-Storage Order for 1.35 GW Upper Sileru Hydropower Plant

PrakashBy PrakashMay 4, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
GE Vernova Secures India’s Largest Pumped-Storage Order for 1.35 GW Upper Sileru Hydropower Plant

GE Vernova Inc. has secured an order from Megha Engineering & Infrastructures Limited (MEIL) to deliver nine 150-pumped-storage units for the 1.35 GW Upper Sileru hydropower plant, which is located in Andhra Pradesh, India. The company expects to complete this project by 2030. Upper Sileru will be the largest pumped-storage hydropower project in India, with a capacity of 1.35 GW.

Once completed, MEIL’s Upper Sileru hydropower plant will be able to store and supply enough electricity equivalent to the annual needs of about three million Indian homes. The Upper Sileru pumped‑storage project is expected to play a critical role in supporting India’s energy transition by providing long‑duration energy storage that helps balance growing solar and wind capacity on the national grid. With its ability to rapidly switch between pumping and generating modes, the facility will support grid reliability, peak demand management, and frequency regulation at scale.

Megha Engineering & Infrastructures Limited said, “The Upper Sileru pumped-storage project is a landmark development for India’s energy transition. Partnering once again with GE Vernova allows us to leverage proven pumped-storage technology to deliver reliable, large-scale energy storage that will support grid stability and enable greater integration of renewable power across the country.”

GE Vernova’s scope of work includes the design, engineering, manufacturing, testing, supply, transportation, and supervision of the erection, testing, and commissioning of the nine units and control and governing systems. The nine vertical Francis reversible units are designed for high efficiency, operational flexibility, and a long service life, enabling reliable performance over several decades of operation.

This project marks the second pumped-storage project GE Vernova and Megha Engineering & Infrastructures Limited (MEIL) are working on together. GE Vernova is currently delivering four 125 MW fixed-speed pumped-storage units for the new Kundah hydropower plant in India.

The project will leverage GE Vernova’s engineering and manufacturing footprint in India and is expected to support local employment, skills development, and industrial capabilities during execution.

Frederic Ribieras, Hydro Power CEO, GE Vernova, said, “We are honoured to be working on this second project with MEIL. Pumped-storage projects are critical to help build a more sustainable energy landscape in India and in the world, stabilising the grid and balancing variable renewable energies at a very large scale and for a long lifetime.”

Pumped Storage Projects

Pumped Storage is a source of large-scale energy storage. Acting as a giant battery, it helps stabilise the grid sustainably, with the integration of wind and solar power. GE Vernova is one of the largest players in the global pumped-Storage space, with nearly 30% of the global installed base and is currently developing more than 3 GW of pumped-Storage projects around the world. GE Vernova had also recently delivered the four 250 MW pumped storage variable speed systems at the Tehri pumped-Storage Hydropower Plant for THDC India Limited, part of the Tehri Hydropower Complex.

GE Vernova in India

GE Vernova has a deep-rooted presence in India, across power generation, transmission and distribution. The company counts five Technology and engineering centres focused on advancing research, development and innovation in new technologies and solutions. Additionally, the company operates 10 manufacturing sites that are undertaking local production and generating employment. The company’s workforce in India comprises over 10,000 employees, including more than 3,000 engineers and technologists.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
energy transition GE Vernova hydropower plant India News Pumped Storage
Prakash
  • Website
  • LinkedIn

I am a Junior Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

10 Mistakes to avoid in Renewable Plus Storage Projects in India

The Integration Gauntlet: 10 Critical Flaws Renewable Plus Storage Projects in India Must Avoid

Leave A Reply Cancel Reply

five × one =

Renewable energy
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Kyro Capital

Kyro Capital Launches ₹100 Crore Pre-IPO Fund Targeting Renewable Energy and Growth Sectors

June 3, 2026
GACL Partners with CleanMax

GACL Partners with CleanMax for 160.24 MW Hybrid Renewable Energy Project in Gujarat

June 3, 2026
AIIMS Nagpur

AIIMS Nagpur Signs MoU with MAHAPREIT for 4 MW Solar Power Project

June 3, 2026
Batteries
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026
Hoymiles Launches AI-Powered HiBattery 4020 Home Energy Storage Series

Hoymiles Launches AI-Powered HiBattery 4020 Home Energy Storage Series

June 3, 2026
Alsym Energy and Re:Build Partner to Scale U.S. Sodium-Ion Battery Manufacturing

Alsym Energy and Re:Build Partner to Scale U.S. Sodium-Ion Battery Manufacturing

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.