Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Godrej Enterprises Secures 98 MWp Open-Access Solar Project in Haryana
Renewable energy

Godrej Enterprises Secures 98 MWp Open-Access Solar Project in Haryana

ManshiBy ManshiApril 8, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
Godrej Enterprises Secures 98 MWp Open-Access Solar Project in Haryana

The Energy Solutions Business of Godrej Enterprises Group has secured an order to develop a 98 MWp (70 MW AC) open-access solar power plant in Sirsa, Haryana. The project marks the company’s largest solar project by capacity to date and is also the largest open-access solar installation in the state.

Turnkey Execution and Project Scope

The project has been awarded by Hexa Climate Solutions, led by Sanjeev Aggarwal and backed by I Squared Capital. Under the agreement, Godrej will undertake complete turnkey execution, including engineering, procurement, and construction (EPC).

Once it is up and running, the solar plant is expected to produce about 147 million kWh (1,470 lakh kWh) of clean energy each year. The open-access model will help industrial customers and encourage more businesses in the area to switch to renewable energy.

Advanced Technology Integration

The project will use bifacial TOPCon modules that are connected to string inverters and smart monitoring systems. The goal of these technologies is to improve the efficiency of generation and make sure that the plant runs at its best throughout its life cycle.

Environmental and Economic Impact

According to company estimates, the project will help reduce over 75,000 tonnes of CO₂ emissions annually equivalent to planting nearly 3.5 million trees. In addition to environmental benefits, the initiative is expected to contribute to local employment generation and infrastructure development in the region.

The company also stated that it will collaborate with regional partners and actively engage local communities during project execution, while adhering to stringent environmental standards.

Leadership Commentary and Strategic Significance

Commenting on the development, Raghavendra Mirji, Executive Vice President and Business Head – Energy Solutions at Godrej Enterprises Group, said, “This project is a proud milestone for us and reinforces our role in India’s renewable energy transition. By developing Haryana’s largest open-access solar installation, we are furthering that legacy while helping industries move towards cleaner and more reliable energy.”

He added that the project will support local employment and strengthen regional infrastructure, aligning with India’s broader growth agenda.

Strengthening Renewable Energy Portfolio

This order makes Godrej Enterprises Group’s Energy Solutions Business even stronger in the renewable energy sector. The company has already installed about 98 MWp of solar panels in India, showing that it is becoming more important in the country’s clean energy sector.

The project also shows that the group wants to take on bigger renewable energy projects, which strengthens its position as a key partner for industries moving to more sustainable energy sources.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
EPC India News infrastructure development renewable energy solar power plant solar project
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Leave A Reply Cancel Reply

six + three =

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.