Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Wind Energy » India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal
Wind Energy

India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal

Shweta KumariBy Shweta KumariOctober 12, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal

India is exploring ways to upgrade around 25 GW of ageing wind Farms, as the government looks to increase generation from existing installations while pursuing its 100 GW wind power target by 2030.

At the eighth edition of Windergy India 2026 in Chennai on 8 October, Union Minister for New and Renewable Energy Pralhad Joshi said the government was working on strategies to repower around 25 GW of older wind energy projects.

The proposal focuses on wind installations nearing the end of their operational lives, where ageing turbines and equipment could be replaced with modern technology. The government has not yet announced which projects will be covered or when the repowering exercise will begin.

What Does Repowering Mean for India?

Instead of developing an entirely new wind farm, repowering allows developers to replace older turbines with newer models that can generate more electricity from available wind resources. The actual gains depend on wind conditions, site characteristics, grid connectivity and the technology installed.

For India, this could offer a way to make better use of existing wind sites as the country expands its renewable energy capacity. However, the proposed 25 GW figure refers to projects being considered for repowering, not additional capacity already approved or installed.

The Road to 100 GW

India’s wind power sector added approximately 6.05 GW of capacity in FY2025–26. Around 3 GW more was installed between April and September 2026, according to reports quoting the minister. Joshi also expressed confidence that wind capacity additions in FY2026–27 would exceed the previous financial year’s level.

The country’s installed wind power capacity stood at 59.20 GW as of 30 September 2026. Reaching 100 GW by 2030 will require further capacity additions through new projects, alongside efforts to improve the performance of existing installations.

Tamil Nadu, Gujarat and Andhra Pradesh are among India’s major wind power states, although the government has not specified where the proposed repowering initiative will begin.

The next step will be to establish which ageing projects are suitable for upgrades and how the process will be implemented. Until the government releases further details, the 25 GW proposal remains an initiative under development rather than a confirmed repowering programme.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
100 GW wind power 100 GW Wind Target India News India Wind Energy wind turbines
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

SECI Floats 4 MW Solar Tender

SECI Floats 4 MW Solar Tender for Elevated Delhi–Dehradun Highway Under RESCO Mode

Trontek Targets 12 GWh Annual BESS Manufacturing Capacity by 2028

Trontek Targets 12 GWh Annual BESS Manufacturing Capacity by 2028

U-Solar Targets 200 MW in New Renewable Assets

U-Solar Targets 200 MW in New Renewable Assets, Turnover to Cross ₹1,000 Crore

Leave A Reply Cancel Reply

four + fifteen =

Renewable energy
India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal

India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal

October 12, 2026
U-Solar Targets 200 MW in New Renewable Assets

U-Solar Targets 200 MW in New Renewable Assets, Turnover to Cross ₹1,000 Crore

October 12, 2026
Prozeal has signed a Framework Agreement with a European IPP

Prozeal Green Energy Signs Framework Agreement for 100 MW Gujarat Solar Project Worth ₹460 Crore

October 12, 2026
KP Group Appoints Devanand Garud as Chief Procurement Officer

KP Group Appoints Devanand Garud as Chief Procurement Officer

October 12, 2026
Batteries
Trontek Targets 12 GWh Annual BESS Manufacturing Capacity by 2028

Trontek Targets 12 GWh Annual BESS Manufacturing Capacity by 2028

October 12, 2026
Fibocom Showcases IoT Solutions for Smart Energy and EV Battery Tracking at IMC 2026

Fibocom Showcases IoT Solutions for Smart Energy and EV Battery Tracking at IMC 2026

October 9, 2026
Birla Carbon Expands Conductive Carbon Solutions for Advanced Battery Applications

Birla Carbon Expands Conductive Carbon Solutions for Advanced Battery Applications

October 9, 2026
NETRA Calls for Multi-Chemistry Battery Strategy to Meet India’s 411 GWh Storage Demand

NETRA Calls for Multi-Chemistry Battery Strategy to Meet India’s 411 GWh Storage Demand

October 9, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.