Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Mizoram Invites Bids for ₹13.09 Crore Solar-Plus-Storage Project at Zoram Medical College
Batteries

Mizoram Invites Bids for ₹13.09 Crore Solar-Plus-Storage Project at Zoram Medical College

Sanjana NegiBy Sanjana NegiJune 24, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Mizoram Invites Bids

The Government of Mizoram has invited bids for an Engineering, Procurement and Construction (EPC) contract worth ₹13.09 crore to develop a 1.5 MW solar power plant coupled with a 900 kWh Battery Energy Storage System (BESS) at Zoram Medical College & Hospital.

The project is aimed at enhancing energy reliability and promoting the use of renewable energy within the state’s healthcare infrastructure. By integrating solar generation with battery storage, the facility is expected to ensure a stable power supply for critical hospital operations while reducing dependence on conventional electricity sources.

The proposed solar-plus-storage installation will generate clean electricity during daylight hours, while the battery energy storage system will store excess power for use during periods of peak demand, grid interruptions, or low solar generation. Such hybrid systems are increasingly being deployed across India to improve energy resilience and maximize renewable energy utilization.

The project forms part of broader efforts to strengthen sustainable infrastructure in the healthcare sector, where uninterrupted power supply is essential for medical equipment, emergency services, laboratories, and patient care facilities. The deployment of battery storage alongside solar generation is expected to enhance energy security and operational efficiency at the medical institution.

India has witnessed growing adoption of solar-plus-storage solutions in recent years, driven by declining technology costs, government support for renewable energy, and the need for reliable power across critical infrastructure sectors. Healthcare facilities, educational institutions, and government buildings are increasingly exploring integrated renewable energy systems to lower electricity costs and improve sustainability.

Once completed, the project is expected to contribute to Mizoram’s clean energy objectives while supporting the state’s efforts to modernize public infrastructure through renewable energy technologies. The tender also presents opportunities for EPC contractors and renewable energy developers to participate in the growing market for distributed solar and energy storage projects.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS India News infrastructure renewable energy solar energy
Sanjana Negi
  • Website

News contributor at The Battery Magazine. I write on the latest developments in battery technology, energy storage solutions, and power innovations. Committed to delivering accurate and timely updates from the world of batteries.

Keep Reading

How Battery Storage Helps India Make Better Use of Solar Power

How Battery Storage Helps India Make Better Use of Solar Power

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

Leave A Reply Cancel Reply

1 × 5 =

Renewable energy

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

October 16, 2026
NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

October 16, 2026
Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

October 16, 2026
Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

October 16, 2026
Batteries
Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

October 16, 2026

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

October 16, 2026
Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

October 16, 2026
NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

October 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.