Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Neuron Energy Commissions 5 GWh BESS Manufacturing Facility in Maharashtra
Batteries

Neuron Energy Commissions 5 GWh BESS Manufacturing Facility in Maharashtra

ManshiBy ManshiApril 10, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Neuron Energy Commissions 5 GWh BESS Manufacturing Facility in Maharashtra

Neuron Energy has commissioned a new battery energy storage system (BESS) manufacturing facility in Talegaon, Maharashtra, marking its strategic entry into the grid-scale energy storage market. The facility has been developed to manufacture containerised BESS solutions designed for deployment across solar and grid infrastructure, enabling efficient storage of excess energy and supply during peak demand periods.

Spread across seven acres, the plant has been established with an investment of Rs 100 crore (Rs 1 billion). It has been designed as a fully automated, robotic production unit with an annual manufacturing capacity of 5 GWh. Additionally, the facility is capable of producing up to 1,000 containerised BESS units per year.

Advanced Manufacturing to Support Renewable Integration

The Talegaon facility’s goal is to improve the infrastructure for storing energy by supporting the integration of renewable energy sources and the stability of the grid. The containerised BESS units will be very important for making sure that power is always available and for balancing solar generation that isn’t always there.

Pratik Kamdar, Co-founder and Chief Executive Officer (CEO) of Neuron Energy, highlighted the strategic importance of the expansion, stating, “The expansion into grid-scale storage aligns with the company’s existing capabilities in advanced energy solutions, and the Talegaon plant will cater to both domestic and international markets.”

Focus on Domestic and Export Markets

Neuron Energy plans to allocate around 60% of the facility’s production capacity to the domestic market, while the remaining 40% will be directed towards exports. The company is targeting a wide customer base, including solar developers, commercial and industrial (C&I) consumers, and utilities.

The facility is also expected to create significant employment opportunities, generating over 500 direct and indirect jobs across engineering, manufacturing, system integration, and technical services.

Expanding Energy Storage Portfolio

Neurone Energy, which started in 2018, focuses on energy storage systems, lithium-ion batteries for electric vehicles (EVs), and ways to charge EVs. The company currently has factories in Kapashera (Delhi), Noida, and Pune, and it is still growing in the advanced energy solutions sector.

With the commissioning of the Talegaon BESS plant, Neuron Energy aims to strengthen its position in the rapidly growing energy storage market while supporting India’s transition towards a more resilient and sustainable energy ecosystem.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS energy storage grid infrastructure India News lithium-ion batteries manufacturing Neuron Energy renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Leave A Reply Cancel Reply

13 − 5 =

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.