Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Neuron Energy Commissions 5 GWh BESS Manufacturing Facility in Maharashtra
Batteries

Neuron Energy Commissions 5 GWh BESS Manufacturing Facility in Maharashtra

ManshiBy ManshiApril 10, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Neuron Energy Commissions 5 GWh BESS Manufacturing Facility in Maharashtra

Neuron Energy has commissioned a new battery energy storage system (BESS) manufacturing facility in Talegaon, Maharashtra, marking its strategic entry into the grid-scale energy storage market. The facility has been developed to manufacture containerised BESS solutions designed for deployment across solar and grid infrastructure, enabling efficient storage of excess energy and supply during peak demand periods.

Spread across seven acres, the plant has been established with an investment of Rs 100 crore (Rs 1 billion). It has been designed as a fully automated, robotic production unit with an annual manufacturing capacity of 5 GWh. Additionally, the facility is capable of producing up to 1,000 containerised BESS units per year.

Advanced Manufacturing to Support Renewable Integration

The Talegaon facility’s goal is to improve the infrastructure for storing energy by supporting the integration of renewable energy sources and the stability of the grid. The containerised BESS units will be very important for making sure that power is always available and for balancing solar generation that isn’t always there.

Pratik Kamdar, Co-founder and Chief Executive Officer (CEO) of Neuron Energy, highlighted the strategic importance of the expansion, stating, “The expansion into grid-scale storage aligns with the company’s existing capabilities in advanced energy solutions, and the Talegaon plant will cater to both domestic and international markets.”

Focus on Domestic and Export Markets

Neuron Energy plans to allocate around 60% of the facility’s production capacity to the domestic market, while the remaining 40% will be directed towards exports. The company is targeting a wide customer base, including solar developers, commercial and industrial (C&I) consumers, and utilities.

The facility is also expected to create significant employment opportunities, generating over 500 direct and indirect jobs across engineering, manufacturing, system integration, and technical services.

Expanding Energy Storage Portfolio

Neurone Energy, which started in 2018, focuses on energy storage systems, lithium-ion batteries for electric vehicles (EVs), and ways to charge EVs. The company currently has factories in Kapashera (Delhi), Noida, and Pune, and it is still growing in the advanced energy solutions sector.

With the commissioning of the Talegaon BESS plant, Neuron Energy aims to strengthen its position in the rapidly growing energy storage market while supporting India’s transition towards a more resilient and sustainable energy ecosystem.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS energy storage grid infrastructure India News lithium-ion batteries manufacturing Neuron Energy renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Leave A Reply Cancel Reply

16 + seventeen =

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.