Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » Solar Tender » NTPC REL Seeks EPC Bids for 900 MW Solar Project Near Kurnool, Andhra Pradesh
Solar Tender

NTPC REL Seeks EPC Bids for 900 MW Solar Project Near Kurnool, Andhra Pradesh

Shivangi GuptaBy Shivangi GuptaOctober 19, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
NTPC REL Seeks EPC Bids for 900 MW Solar Project Near Kurnool, Andhra Pradesh

NTPC Renewable Energy Limited (NTPC REL) has invited bids for the engineering, procurement and construction (EPC) of a 900 MW grid-connected, ground-mounted solar power project near its Kurnool Solar Project in Andhra Pradesh. The tender includes land acquisition, power evacuation infrastructure and the development of a substation bay.

The project will be connected to the Inter-State Transmission System (ISTS). Interested bidders must submit their bids by November 16, 2026.

Under the tender, the selected bidder will be responsible for the complete development of the solar project, including design, engineering, equipment supply, construction, installation and commissioning. The scope also covers the operation and maintenance (O&M) of the solar plant, along with the provision of consumables and spare parts for three years from the date of commissioning.

Key Responsibilities Under the Tender

The selected bidder will be required to undertake the following activities:

  • Project Capacity: Develop a 900 MW ISTS-connected, ground-mounted solar power project near Kurnool, Andhra Pradesh.
  • Land Acquisition: Identify and acquire suitable, encumbrance-free land for the solar project and the owner’s Battery Energy Storage System (BESS) project. Ownership or lease rights must be transferred to NTPC REL.
  • 400 kV Substation Bay: Supply, install and commission a new 400 kV terminal line bay at NTPC REL’s Kurnool Solar Project Pooling Substation (PSS), including bus extension if required.
  •  Transmission Infrastructure: Develop a dedicated 400 kV transmission line connecting the solar plant to the Kurnool Solar Project PSS and secure the necessary Right of Way (ROW).
  • Complete EPC Works: Execute all civil, structural and electrical works, including the supply and installation of solar modules and associated equipment.
  • Power Evacuation: Establish the power evacuation system up to the Kurnool Solar Project PSS and install telemetry infrastructure up to the ISTS pooling substation through the designated PSS.
  • Equipment Supply and Commissioning: Handle the design, engineering, manufacturing, supply, transportation, installation and commissioning of the grid-connected solar photovoltaic (PV) project.
  • Operation and Maintenance: Provide O&M services and supply the required consumables and spare parts for three years from the project’s commissioning date.

NTPC REL Solar Tender: Key Details

  • Tendering Authority: NTPC Renewable Energy Limited (NTPC REL)
  • Project Capacity: 900 MW
  • Project Type: Ground-mounted solar power project
  • Connectivity: Inter-State Transmission System (ISTS)
  • Location: Near Kurnool, Andhra Pradesh
  • Tender Type: Engineering, Procurement and Construction (EPC)
  • Land Requirement: Land for the solar project and the owner’s BESS project
  • Transmission Infrastructure: Dedicated 400 kV transmission line and terminal bay
  • O&M Period: Three years for the specified O&M scope and consumables/spares
  • Bid Submission Deadline: November 16, 2026
Capacity 900 MW
Location Near Kurnool, Andhra Pradesh
Last Date 16/11/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
900 MW Solar Project India News Kurnool Solar Project NTPC Renewable Energy renewable energy tenders solar energy Solar EPC Tender
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

MAHAGENCO Invites Bids for 500 MW/1,600 MWh Battery Energy Storage Projects Across Maharashtra

MAHAGENCO Invites Bids for 500 MW/1,600 MWh Battery Energy Storage Projects Across Maharashtra

SPML Infra Honoured as “Fastest Growing Construction Company” at Construction World Global Awards 2026

SPML Infra Honoured as “Fastest Growing Construction Company” at Construction World Global Awards 2026

Polycab India Reports 53% Revenue Growth in Q2 FY27 on Strong Cables and FMEG Performance

Polycab India Reports 53% Revenue Growth in Q2 FY27 on Strong Cables and FMEG Performance

Leave A Reply Cancel Reply

seventeen − 12 =

Renewable energy
SPML Infra Honoured as “Fastest Growing Construction Company” at Construction World Global Awards 2026

SPML Infra Honoured as “Fastest Growing Construction Company” at Construction World Global Awards 2026

October 19, 2026

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

October 16, 2026
NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

October 16, 2026
Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

October 16, 2026
Batteries
MAHAGENCO Invites Bids for 500 MW/1,600 MWh Battery Energy Storage Projects Across Maharashtra

MAHAGENCO Invites Bids for 500 MW/1,600 MWh Battery Energy Storage Projects Across Maharashtra

October 19, 2026
Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

October 16, 2026

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

October 16, 2026
Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

October 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.