Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » NTPC Renewable Energy Floats EPC Tender for 300 MW Solar Project in Rajasthan
Tenders

NTPC Renewable Energy Floats EPC Tender for 300 MW Solar Project in Rajasthan

PrakashBy PrakashJune 2, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
NGEL Floats Tender for 3,200 MWh Battery Storage Project in Rajasthan

NTPC Renewable Energy Limited (NREL), a wholly owned subsidiary of NTPC Limited, has invited bids for the development of a 300 MW (1×300 MW) grid-connected solar PV project near Nokhra, Rajasthan, as part of its ongoing renewable energy expansion plans.

The project will be developed under an Engineering, Procurement and Construction (EPC) contract and will comprise a single 300 MW solar block equipped with tracker-based module mounting structures, solar PV modules, inverter systems, transformers, switchgear, SCADA, weather monitoring systems, CCTV surveillance, and associated civil and electrical infrastructure.

The scope of work includes design, engineering, supply, installation, testing, and commissioning of the solar plant, along with power evacuation infrastructure up to the owner’s 33 kV pooling substation. The selected contractor will also be responsible for module cleaning systems, internal roads, drainage works, dynamic reactive power compensation systems, mandatory spares, and three years of comprehensive operation and maintenance services following commissioning.

The bidding process is currently open to eligible companies with experience in solar power development, renewable energy projects, and large-scale EPC execution. Interested bidders can submit their proposals until June 22, 2026, while the pre-bid conference and the deadline for submitting queries have been scheduled for June 12, 2026.

Located in Rajasthan, one of India’s leading solar energy states, the 300 MW project is expected to contribute significantly to the country’s renewable energy generation capacity. The initiative aligns with NREL’s broader strategy of accelerating the deployment of utility-scale solar projects and supporting India’s transition towards a cleaner, more sustainable energy future.

NTPC Limited is India’s largest integrated power utility and a leading energy company engaged in the generation, transmission, and sale of electricity. Established in 1975 and headquartered in New Delhi, NTPC operates a diverse portfolio that includes coal, gas, hydro, solar, and wind power projects. The company plays a key role in meeting India’s growing energy demand while advancing the country’s clean energy transition.

Through its renewable energy arm, NTPC Renewable Energy Limited, NTPC is expanding its presence in solar, wind, green hydrogen, and energy storage projects, supporting India’s long-term sustainability and net-zero ambitions. As one of the country’s largest power producers, NTPC continues to drive innovation, energy security, and infrastructure development across the power sector.

Capacity 300 MW
Location Nokhra, Rajasthan
Last Date 22/06/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
India News NTPC NTPC Renewable Energy Limited renewable energy Solar Power Project
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

Leave A Reply Cancel Reply

8 + 11 =

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.