Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » NVVN Invites Bids for 125 MW / 500 MWh Standalone BESS Project in Chhattisgarh
Tenders

NVVN Invites Bids for 125 MW / 500 MWh Standalone BESS Project in Chhattisgarh

Shweta KumariBy Shweta KumariDecember 3, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
NTPC Vidyut Vyapar Nigam Ltd. (NVVN) has issued an open tender inviting bids to develop a 125 MW / 500 MWh standalone Battery Energy Storage System (BESS)

In a move aimed at boosting energy storage capacity and grid flexibility, NTPC Vidyut Vyapar Nigam Ltd. (NVVN) has issued an open tender inviting bids to develop a 125 MW / 500 MWh standalone Battery Energy Storage System (BESS) at a 220 kV substation in Durg district, Chhattisgarh. The project seeks to reinforce grid stability and support peak-load management in the region.

Tender Overview

  • Total BESS Capacity: 125 MW / 500 MWh
  • Project Location: Near 220 kV Khedamara Substation, Durg district, Chhattisgarh
  • Bidding Route: Competitive bid / Request for Selection (RfS)
  • Issuing Authority: NTPC Vidyut Vyapar Nigam Ltd. (NVVN)

Financial & Bid Conditions

  • Bid Processing Fee: ₹1.5 million + 18% GST
  • Earnest Money Deposit (EMD): ₹880,000 per MW of quoted capacity
  • Performance Bank Guarantee (PBG) on award: ₹2.2 million per MW awarded capacity
  • Success Charge: ₹100,000 per MW + 18% GST, payable within 30 days of Letter of Award (LoA)
  • Viability Gap Funding (VGF): ₹1.8 million per MWh of awarded capacity — total support ceiling ₹900 million (for 500 MWh)

Technical & Performance Specifications

  • Minimum Round-Trip Efficiency (RtE): 85% (monthly guarantee)
  • Operational Cycle Requirement: At least one full charge–discharge cycle/day (~420 cycles/year)
  • Capacity Retention at Contract End: Dispatchable capacity must remain ≥ 70% by end of 16-year contract period
  • System Availability: Minimum 95% monthly availability required; NVVN may impose liquidated damages for shortfalls
  • Contract Termination Clause: NVVN reserves the right to terminate if availability remains below 50% for two or more cumulative years

Developer Eligibility Criteria

Must have positive net worth in the last three financial years

  • Minimum Net Worth: ₹8.8 million per MW of quoted capacity (≈ ₹110 crore for 125 MW project)
  • Minimum Average Annual Turnover (last 3 years): ₹29.2 million per MW quoted capacity

Capacity 25 MW / 500 MWh
Location Durg district, Chhattisgarh
Last Date 30/12/2025
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery storage BESS India Chhattisgarh Grid Stability NVVN Power Sector renewable integration
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

Utility scale Battery Projects in India

When the Sun Sets, Batteries Rise: Utility-Scale Battery Projects in India

India’s Clean Energy and Sustainability Transition Needs Urgent Focus on AI & Skilling; Industry leaders on World Youth Skills Day

India’s Clean Energy and Sustainability Transition Needs Urgent Focus on AI & Skilling; Industry leaders on World Youth Skills Day

REMC Invites Bids for 17 MW Solar and 2.5 MW/50 MWh Battery Energy Storage Project in Gujarat

REMC Invites Bids for 17 MW Solar and 2.5 MW/50 MWh Battery Energy Storage Project in Gujarat

Comments are closed.

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.