Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Patel Engineering Secures ₹910 Crore Contract for Renuka Ji Dam Project in Himachal Pradesh
Renewable energy

Patel Engineering Secures ₹910 Crore Contract for Renuka Ji Dam Project in Himachal Pradesh

ManshiBy ManshiMarch 20, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Patel Engineering Secures ₹910 Crore Contract for Renuka Ji Dam Project in Himachal Pradesh

Patel Engineering Limited has received a major boost to its project portfolio with the award of a ₹910.08 crore contract for the Renuka Ji Dam Project (Package-1). The Letter of Award (LOA) was issued by Himachal Pradesh Power Corporation Limited (HPPCL) on March 19, 2026.

LOA Confirms Major Infrastructure Win

The award follows Patel Engineering’s earlier selection as the lowest (L1) bidder for the project. The issuance of the LOA formally marks the commencement of the company’s engagement in this significant infrastructure development.

The project is in the Sirmaur district of Himachal Pradesh, in the village of Dadahu, Tehsil Renuka. It should be done in 30 months.

Project Scope and Key Features

Patel Engineering will build three big diversion tunnels under the contract. Each tunnel will be 9.5 meters wide and 1.3 to 1.6 kilometres long. The work also includes building structures for the inlet and outlet, as well as about 6 kilometres of roads for getting to and from the site.

In addition, the project involves the installation of advanced hydro-mechanical systems designed to regulate water flow efficiently. Comprehensive instrumentation and monitoring systems will also be deployed to ensure long-term safety, reliability, and operational efficiency.

Strengthening Hydropower Capabilities

The Renuka Ji Dam Project is an important step forward for Himachal Pradesh’s hydropower infrastructure. The award shows that HPPCL trusts Patel Engineering to handle technically difficult and large-scale infrastructure projects.

Company Track Record

Established in 1949, Patel Engineering has built a strong presence in hydropower, tunnelling, and irrigation sectors. The company has completed over 85 dams, 40 hydroelectric projects, and more than 300 kilometers of tunnelling, working extensively with central public sector undertakings and state government bodies.

Market Performance and Outlook

On March 19, 2026, Patel Engineering’s shares were worth ₹25.09 on the NSE, which was 0.48% more than the last closing price.

The company’s latest contract win strengthens its position in India’s infrastructure sector and shows that it is still focused on quality, safety, and innovation. The Renuka Ji Dam Project is expected to be very important for improving water resource management and helping the development of the region in Himachal Pradesh.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
HPPCL hydroelectric projects India News Patel Engineering Limited
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

Leave A Reply Cancel Reply

nine − seven =

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.