Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Pratap Technocrats Secures Major ₹776 Crore Green Energy Deal with NTPC
Battery Manufacturing (BESS)

Pratap Technocrats Secures Major ₹776 Crore Green Energy Deal with NTPC

Shweta KumariBy Shweta KumariMay 6, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Pratap Technocrats Secures Major ₹776 Crore Green Energy Deal with NTPC

Pratap Technocrats, a leading infrastructure firm based in Gurugram has announced that it has officially confirmed its spot in the Renewable Energy Sector with a massive ₹776.13 crore contract from NTPC Limited for one the biggest Battery Energy Storage Projects in India. This major project win signalls Pratap Technologies shift from a telecom network expert to a Renewable Energy Player too.

Key Details Under the Agreement

Pratap Technocrats has to install 570 MWh of BESS in Madhya Pradesh across two of its major Power Plants as part of this agreement

  • NTPC GADARWARA : 320 MWh capacity
  • NTPC Khargone: 250 MWh capacity

Pratap Technocrats will be the responsible for the entire project from the first design and engineering to the final commissioning of the 570 MWh of BESS Project in Madhya pradesh. These high-tech battery systems act like ” gaint power banks” balancing the grid. They provide a consistent and dependable power supply for homes and businesses by storing excess electricity during periods of low demand and releasing it during peak hours.

As India is moving towards becoming more reliable on Renewable Energy sources like the Solar, wind and hydro, the grid needs to be able to handle the fluctuations due to Renewable Energy. This BESS Project will help stabilize the grid reducing the risk of power outages.

“This project reflects the trust placed in our execution capabilities,” said Devendra Singh Shekhawat, Chairman of Pratap Technocrats.

He highlighted that the project is a “significant milestone” that supports India’s transition toward a sustainable and resilient energy future.

This deal comes shortly after the company won several packages under the government’s BharatNet Phase 3 program. By securing this NTPC contract, Pratap Technocrats is proving its ability to deliver large-scale, future-ready infrastructure. The project not only strengthens India’s energy security but also positions Pratap Technocrats as a key player in the nation’s journey toward a green and clean energy ecosystem.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery storage green energy India India News NTPC Limited
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

CERC Orders CTUIL to Restore Connectivity for Pace Digitek’s 100 MW Solar-BESS Project

CERC Orders CTUIL to Restore Connectivity for Pace Digitek’s 100 MW Solar-BESS Project

Coal India has put 200 MW of the 300 MW Khavda Solar Project into service

Coal India has put 200 MW of the 300 MW Khavda Solar Project into service

Leave A Reply Cancel Reply

three × 3 =

Renewable energy
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026
CERC Orders CTUIL to Restore Connectivity for Pace Digitek’s 100 MW Solar-BESS Project

CERC Orders CTUIL to Restore Connectivity for Pace Digitek’s 100 MW Solar-BESS Project

July 17, 2026
Coal India has put 200 MW of the 300 MW Khavda Solar Project into service

Coal India has put 200 MW of the 300 MW Khavda Solar Project into service

July 17, 2026
GRE Renew Enertech Crosses 100 MWp Solar Installations, Builds Rs. 224 Crore Order Book

GRE Renew Enertech Crosses 100 MWp Solar Installations, Builds Rs. 224 Crore Order Book

July 17, 2026
Batteries
The Rural Development Department of Uttar Pradesh, Grants Servotech Renewable a 900 kW Hybrid Solar Rooftop with BESS Project

The Rural Development Department of Uttar Pradesh, Grants Servotech Renewable a 900 kW Hybrid Solar Rooftop with BESS Project

July 17, 2026
CATL and Alfen Will Deploy 5 GWh of Sodium-ion Battery Storage Across Europe

CATL and Alfen Will Deploy 5 GWh of Sodium-ion Battery Storage Across Europe

July 17, 2026
Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh

Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh

July 16, 2026
XAVOLT Energy Signs MoU with DRIIV to Advance Affordable Battery Energy Storage Solutions

XAVOLT Energy Signs MoU with DRIIV to Advance Affordable Battery Energy Storage Solutions

July 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.