The Battery Magazine Logo

Subscribe to The Battery Magazine's Current Newsletter & never miss an update!

    Close Menu
    The Battery MagazineThe Battery Magazine
    • Home
    • Batteries
      • EV & Automotive
      • Portable Power
      • Stationary & Industrial
    • Articles
    • Charging
    • Manufacturing
    • Renewable
    • Hydrogen
    • Tenders
      • Energy Storage
      • Renewable Tender
    • Events
    • E-Mag
    Facebook LinkedIn WhatsApp
    The Battery MagazineThe Battery Magazine
    • Home
    • Batteries
      • EV & Automotive
      • Portable Power
      • Stationary & Industrial
    • Articles
    • Charging
    • Manufacturing
    • Renewable
    • Hydrogen
    • Tenders
      • Energy Storage
      • Renewable Tender
    • Events
    • E-Mag
    LinkedIn Facebook WhatsApp
    The Battery MagazineThe Battery Magazine
    Home » Sineng Electric Unveils Next-Generation 430kW Liquid Cooling String PCS

    Sineng Electric Unveils Next-Generation 430kW Liquid Cooling String PCS

    Shweta KumariBy Shweta KumariApril 19, 2025Updated:April 19, 2025 Battery 4 Mins Read
    Facebook Twitter LinkedIn WhatsApp
    Sineng Electric unveils 430kW liquid cooling string PCS

    Sineng Electric, a global leader in solar and energy storage solutions, recently unveiled its state-of-the-art 430kW liquid cooling string PCS. This launch sets a new benchmark in high-power energy storage, delivering superior efficiency, reliability, and safety.

    Exceptional Flexibility and Compatibility

    As the industry shifts toward higher-capacity battery cells, Sineng’s 430kW PCS offers remarkable flexibility across a wide range of application scenarios while optimizing the Levelized Cost of Storage (LCOS). Featuring advanced technology and an innovative architecture, the PCS supports different configurations, ensuring flexible scalability and compatibility with 6MWh+ battery containers. Furthermore, it supports liquid cooling and grid forming, catering to various installation requirements.

    Liquid Cooling Technology for Superior Performance

    Harnessing advanced liquid cooling technology, the 430kW PCS achieves balanced heat dissipation and reduces overall temperature rise by 5K. This thermal management not only extends the product’s operational lifespan to 25 years but also improves charging and discharging efficiency, directly enhancing return on investment.

    Enhanced Efficiency

    By integrating liquid cooling technology and an optimized power control algorithm, the PCS improves its round-trip efficiency (RTE) by 0.2% while reducing auxiliary power consumption by 30%. Its cluster-level management increases system charge and discharge capacity by over 7% throughout its lifecycle, thereby maximizing the operational cost-effectiveness.

    Higher Power Density

    Compared with the previous-generation string PCS, the 430kW PCS delivers a 130% increase in power density, enabling a 20% reduction in footprint for projects of the same capacity. Its compact design makes it ideal for space-constrained installations, minimizing infrastructure and material costs.

    Exceptional Adaptability for Diverse Environments

    Built to withstand harsh conditions, the PCS is equipped with IP66 and C5 anti-corrosion protection, ensuring consistent performance across a wide temperature range from -40°C to 60°C, at altitudes up to 5,000m, and in corrosive coastal environments. The liquid cooling technology effectively mitigates the heat island effect and reduces the ambient temperature within the power station by up to 5°C.

    Advanced Safety Measures

    To mitigate potential risks associated with short circuits, the PCS limits DC short-circuit current to 10kA level, effectively preventing cascading failures and enhancing operational safety.

    O&M Cost Optimization

    Through the cluster-level management and automated state-of-charge (SOC) calibration, the PCS reduces maintenance costs by up to 50%, ensuring streamlined, intelligent operation and maintenance processes.

    Reliability & Simplified O&M

    The 430kW string PCS can be integrated into turnkey stations of varying capacities. Its modular design for PCS, coupled with IP68 plug-and-play terminals, enables rapid replacement within 30 minutes – substantially minimizing downtime. This streamlined maintenance approach ensures annual system availability exceeding 99.5%.

    Next-Generation Grid Forming Technology

    By incorporating next-generation grid-forming technology, the PCS delivers exceptional stability across modern power systems. With capabilities including seamless on-grid and off-grid switching, continuous fault ride-through, grid inertia response and primary frequency response, the solution ensures grid resilience even in the most challenging conditions. Additionally, in the event of a system-wide failure, the black start capability is enabled through a wireless parallel connection, facilitating the restoration of grid stability.

    6.25MW Liquid Cooling String PCS MV Turnkey Station

    The 430kW string PCS can be configured into a 6.25MW MV turnkey station. In a 100MW energy storage project, this solution can reduce the number of devices by 20%, thereby lowering the cost per kWh by 0.27 cents. Its integrated liquid cooling system also contributes to a reduced sound pressure level, ensuring quieter operation, with the overall noise level kept below 75 decibels.

    As the global energy landscape embraces a more diversified energy mix, energy storage remains pivotal in maximizing clean energy utilization and stabilizing contemporary power systems. Sineng Electric, through groundbreaking technological innovation, reaffirms its commitment to delivering advanced energy solutions that accelerate the transition toward a carbon-neutral future.

    430kW PCS Energy Storage Solutions Grid Forming high power density liquid cooling technology renewable energy systems Sineng Electric
    Shweta Kumari

    More article from Shweta Kumari

    Keep Reading

    Avaada Electro Appoints Kaushal Shah as Chief Financial Officer

    Jinko ESS Secures 140 MWh UK Grid-Scale Energy Storage Project with AGR Renewables

    Jinko ESS Deploys 8 SunGiga Storage Systems for Commercial Energy Efficiency in Wenzhou

    Comments are closed.

    MANUFACTURING & MATERIALS

    LG Energy Solution Reports Robust Q2 2025 Performance

    July 25, 2025

    Lucid Launches MINAC Partnership to Boost U.S. EV Mineral Supply Chain

    July 24, 2025

    Himadri Eyes Larger Sicona Stake to Boost EV Battery Tech

    July 23, 2025

    Xcel Energy Unveils New Power Projects to Fuel Growth in Texas and New Mexico

    July 21, 2025
    Batteries

    Avaada Electro Appoints Kaushal Shah as Chief Financial Officer

    August 4, 2025

    Jinko ESS Secures 140 MWh UK Grid-Scale Energy Storage Project with AGR Renewables

    August 4, 2025

    Jinko ESS Deploys 8 SunGiga Storage Systems for Commercial Energy Efficiency in Wenzhou

    August 4, 2025

    Rays Power Infra Secures 1,440 MW Clean Energy Projects with 830 MWh BESS Across India

    August 4, 2025

    Subscribe for Updates

    Get the latest news about energy storage in your inbox.

      © 2025 Thebatterymagazine.
      • Home
      • About Us
      • Contact Us
      • Privacy Policy
      • Terms of Service

      Type above and press Enter to search. Press Esc to cancel.