Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Sorigin RE Services Secures First Standalone BESS Project in Rajasthan
Battery Manufacturing (BESS)

Sorigin RE Services Secures First Standalone BESS Project in Rajasthan

ManshiBy ManshiMarch 18, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Sorigin RE Services Secures First Standalone BESS Project in Rajasthan

Sorigin RE Services has secured its first standalone Battery Energy Storage System (BESS) project in Rajasthan, with a total capacity of 250 MW / 500 MWh. The project has been awarded by one of India’s leading independent power producers, marking a significant milestone in the company’s clean energy journey.

The development is a strategic move by Sorigin RE Services to get into large-scale energy storage solutions, which are an important part of making India’s renewable energy infrastructure stronger.

Dual-site installations to enhance grid efficiency

There will be two installations of 125 MW and 250 MWh each in Giral and Suratgarh, Rajasthan. These sites were chosen to help with important grid functions like stability, managing peak demand, and better integrating renewable energy sources.

With increasing renewable penetration, energy storage systems like BESS are becoming essential to balance supply and demand, ensuring consistent power availability even during fluctuations in solar and wind generation.

Supporting India’s renewable energy and climate goals

Sorigin RE Services wants to provide complete Engineering, Procurement, and Construction (EPC) solutions for battery storage infrastructure through this project. The company said that the project is important on a larger scale because it fits with the country’s clean energy goals.

“Through end-to-end EPC solutions for BESS, we are enabling reliable, resilient, and flexible power systems that support India’s target of 500 GW of non-fossil fuel capacity by 2030 and its Net Zero 2070 vision.”

Strengthening the future of energy storage

This milestone shows how important battery storage technologies are becoming as India moves toward a more sustainable energy future. As the amount of renewable energy grows, projects like this one will be very important for keeping the grid reliable and flexible.

The Rajasthan BESS project not only reinforces Sorigin RE Services’ capabilities in delivering advanced energy solutions but also highlights the increasing role of private sector participation in accelerating the country’s clean energy transition.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS Energy Storage Solutions India News renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Leave A Reply Cancel Reply

17 − 2 =

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.