NTPC Terminates Mouda 400 MWh BESS Contract Due to Contractor DefaultSeptember 24, 2026 NTPC Limited has terminated its contract with M/s GR Infraprojects Limited (GRIL) for the development of a 400 MWh Battery Energy Storage System (BESS) at the Mouda Super Thermal Power…