Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Solar » Tata Power Renewables Crosses 7 GW Operational Capacity with 100 MW Kayathar Solar Project
Solar

Tata Power Renewables Crosses 7 GW Operational Capacity with 100 MW Kayathar Solar Project

Shivangi GuptaBy Shivangi GuptaAugust 31, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Tata Power Renewables Crosses 7 GW Operational Capacity

Tata Power Renewable Energy Limited (TPREL), a subsidiary of The Tata Power Company Limited, has commissioned its 100 MW Group Captive Solar Project, TNGC-2, in Tamil Nadu. Located across Vellalankottai and Nalandhula villages in Kayathar, the project marks another step in TPREL’s efforts to expand its renewable energy portfolio and support the growing adoption of solar power in India.

With this commissioning, TPREL utility portfolio now grows to 12.3 GW and has surpassed the landmark 7 GW operational capacity milestone, reinforcing its position as a leading force in India’s clean energy transition.

The project will supply clean power to TP Solar Limited (40.625 MW), Tata Power’s solar manufacturing arm producing high-efficiency solar cells and modules, Tata Electronics Private Limited (53.125 MW), a leading electronics manufacturing company focused on semiconductors, precision engineering and advanced electronics and Tata Realty And Infrastructure Limited (6.25 MW), Tata Group’s real estate and infrastructure development company, reinforcing Tata Group Companies’ commitment to sustainable operations and accelerating India’s clean energy transition.

The project is designed to generate 240.63 million units (MUs) of clean electricity annually and is expected to offset approximately 1.5 lakh tonnes of CO2 emissions per annum.

One of the key highlights of the project is the first-of-its-kind deployment of the Flexible Terrain Compatible (FTC) Single Axis Tracker technology in India for a Tata project. Equipped with 2,61,660 Mono PERC bifacial solar modules, the project is engineered to maximise energy generation while improving operational efficiency across varying terrain conditions.

The project highlights TPREL’s expertise in executing large-scale solar projects through engineering excellence, best-in-class construction practices and a steadfast focus on quality. The power generated will be transmitted through the Kayathar 400 kV Grid Substation (GSS), ensuring reliable evacuation and efficient delivery of renewable energy to the beneficiary companies.

The Company’s 7 GW operational capacity comprise more than 5.7 GW of solar and 1.3 GW of wind energy assets. Further strengthening its growth trajectory, Tata Power Renewable has an additional 5.3 GW under various stages of

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy clean energy transition energy storage India News renewable energy Solar solar projects
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Sachin Sehgal Joins Adani Power as Head of Administration

Sachin Sehgal Joins Adani Power as Head of Administration, Brings Extensive Operations Expertise

Fast-Growing Solar Manufacturing Companies

7 Fast-Growing Solar Manufacturing Companies Powering India’s Renewable Energy Expansion

Livguard Strengthens Kashmir Presence

Livguard Strengthens Kashmir Presence with First Exclusive Brand Outlet in Anantnag

Leave A Reply Cancel Reply

two × one =

Renewable energy
Sachin Sehgal Joins Adani Power as Head of Administration

Sachin Sehgal Joins Adani Power as Head of Administration, Brings Extensive Operations Expertise

August 31, 2026
Livguard Strengthens Kashmir Presence

Livguard Strengthens Kashmir Presence with First Exclusive Brand Outlet in Anantnag

August 31, 2026
Tata Power Renewables Crosses 7 GW Operational Capacity

Tata Power Renewables Crosses 7 GW Operational Capacity with 100 MW Kayathar Solar Project

August 31, 2026
GREW Solar Expands North India Distribution Network

GREW Solar Expands North India Distribution Network with PS Cube Industries Partnership

August 31, 2026
Batteries
Copenhagen Infrastructure Partners Expands Australian Portfolio

Copenhagen Infrastructure Partners Expands Australian Portfolio with Wind and Battery Project Acquisition

August 31, 2026
KP Green Engineering Secures rs258 Crore

KP Green Engineering Secures ₹258 Crore Orders as KPI Green Energy Accelerates Solar, Wind and BESS Expansion

August 31, 2026
SECI Floats Tender for 50 MW/100 MWh Standalone BESS

SECI Floats Tender for 50 MW/100 MWh Standalone BESS on Short-Term Basis

August 31, 2026
CATL Unveils Local Partnership

CATL Unveils Local Partnership and Full-Chain Energy Storage Solutions in South America

August 29, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.