Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » TGGENCO Invites Bids for 375 MW / 1,500 MWh Standalone BESS Projects
Tenders

TGGENCO Invites Bids for 375 MW / 1,500 MWh Standalone BESS Projects

Shweta KumariBy Shweta KumariNovember 25, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
TGGENCO Issues Tender for 1.5 GWh BESS Projects

In a major push toward flexible, dispatchable renewable energy, Telangana Power Generation Corporation (TGGENCO) has issued a tender inviting bids to develop 375 MW / 1,500 MWh of standalone Battery Energy Storage Systems (BESS) across two project sites. The tender aims to enhance Telangana’s peak management, renewable integration, and grid reliability.

Bids must be submitted by December 27, 2025, and will be opened on December 31, 2025.

Tender Overview

  • Total BESS Capacity: 375 MW / 1,500 MWh

Project Structure:

  • Project 1: 187.5 MW / 750 MWh at Maheswaram (400/220 kV)
  • Project 2: 187.5 MW / 750 MWh at Choutuppal (400/220 kV)

Bidding Route: Notified as competitive bid

Issuing Authority: Telangana Power Generation Corporation (TGGENCO)

Financial Requirements

Bidders must comply with the following financial obligations:

  • Document Processing Fee: ₹1,000,000 (~$11,214) per project
  • Earnest Money Deposit (EMD): ₹500,000 (~$5,604) per MW of quoted capacity
  • Performance Bank Guarantee (PBG): ₹1,250,000 (~$14,018) per MW of awarded capacity
  • Success Charges: ₹100,000 (~$1,121) per MW of awarded capacity

The project will also receive Viability Gap Funding (VGF) of ₹1,800,000 (~$20,186) per MWh of awarded capacity, disbursed in three stages:

  • 20% at financial closure
  • 50% at COD
  • 30% one year after COD, upon certification

Project Site & Grid Integration

  • Project 1: Integrated with 400/220 kV Maheswaram substation
  • Project 2: Integrated with 400/220 kV Choutuppal substation

Land will be provided on a right-to-use basis at a token lease of ₹1 per acre per year.

Technical Specifications

The BESS must satisfy stringent performance standards:

  • One full operational cycle per day (4-hour charge + discharge)
  • Minimum system availability: 95% annually
  • Minimum AC-to-AC round-trip efficiency: 85% (monthly), excluding auxiliaries
  • Technology Requirement: Must use commercially established and operational technologies
  • Auxiliary Power: Developer may use DISCOM connection or draw from interconnection point

Key Timelines

  • BESPA Signing: Within 30 days of LoA
  • Commissioning Deadline: 18 months from BESPA effective date
  • BESPA Tenure: 15 years from full commissioning

Eligibility Requirements

  • Net Worth Requirement: ≥ ₹27,500,000 (~$84,111) per MWh
  • Assessed either as of the last financial year
  • Or at least 7 days before bid submission

The tender mandates that only mature, commercially deployed storage technologies be used to ensure timely commissioning and reduce technology risk.

Capacity 375 MW / 1,500 MWh standalone Battery Energy Storage Systems (BESS)
Location Maheswaram (400/220 kV) and Choutuppal (400/220 kV) substations in Telangana
Last Date 27/12/2025
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery projects BESS tender energy storage Grid Stability renewable integration TGGENCO
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

Beyond Solar: How Solar plus Storage Projects in India Are Reshaping India's Energy Future

Beyond Solar: How Solar plus Storage Projects in India Are Reshaping India’s Energy Future

Utility scale Battery Projects in India

When the Sun Sets, Batteries Rise: Utility-Scale Battery Projects in India

Comments are closed.

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.