Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » West Bengal Green Energy Development Corporation Limited Floats 3.5 MW Rooftop Solar Tenders with BESS
Tenders

West Bengal Green Energy Development Corporation Limited Floats 3.5 MW Rooftop Solar Tenders with BESS

Shweta KumariBy Shweta KumariFebruary 10, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
West Bengal Green Energy Development Corporation Limited Floats 3.5 MW Rooftop Solar Tenders with Battery Energy Storage

West Bengal Green Energy Development Corporation Limited (WBGEDCL) has floated multiple domestic competitive bidding (DCB) tenders for the design, engineering, procurement, supply, installation, testing, commissioning, and comprehensive maintenance of grid-connected rooftop solar photovoltaic (GRTSPV) systems integrated with Battery Energy Storage Systems (BESS) across different locations in West Bengal.

The cumulative rooftop solar capacity under these tenders is approximately 3.5 MW, with battery storage systems deployed site-wise.

Nature of the Tender

  • Tendering mode: Domestic Competitive Bidding (DCB) through e-tendering
  • Tender type: Multiple NIeTs issued separately for different locations
  • Project model: Rooftop solar PV with co-located BESS
  • Maintenance period: 5 years comprehensive maintenance from date of commissioning

Each NIeT represents an independent package, collectively contributing to the overall rooftop solar capacity.

Project Locations and Capacities

The tenders cover rooftop solar-plus-storage installations at multiple government and institutional sites, including layer farms and public facilities across districts such as:

  • Bankura – 0.5 MWp solar with 0.5 MW / 0.7 MWh BESS
  • Malda – 1 MWp solar with 0.5 MW / 1.8 MWh BESS
  • Nadia (Haringhata) – 1 MWp solar with 2 MWh BESS
  • Cooch Behar (Mekhliganj) – 1 MWp solar with 0.5 MW / 1.8 MWh BESS

(Additional smaller rooftop packages under separate NIeTs contribute to the total aggregated capacity.)

Scope of Work

The scope under each NIeT includes:

  • Design and detailed engineering of rooftop solar PV systems
  • Manufacture/procurement and supply of solar and BESS equipment
  • Installation and commissioning of GRTSPV and BESS
  • Integration with grid, generator, and energy management systems
  • Supervisory control, monitoring, and load balancing
  • Comprehensive operation and maintenance for five years

Estimated Project Cost

The estimated project cost varies by location and capacity, ranging from ₹6.14 crore to over ₹11.37 crore (including GST) per package, as specified in individual NIeT documents.

Bid Security and Fees

  • Tender document fee: ₹10,000 plus 18% GST (non-refundable)
  • Earnest Money Deposit (EMD): Ranges between ₹12.28 lakh and ₹22.74 lakh, depending on the package
  • Additional performance security: 10% of tendered value, if applicable

Key Dates

  • NIeT publication date: 6 February 2026
  • Pre-bid query deadline: 11 February 2026
  • Pre-bid meeting: 11–12 February 2026 (as per respective NIeTs)
  • Bid submission deadline: 27 February 2026 (up to 4:00 PM)
  • Technical bid opening: 2 March 2026
  • Financial bid opening: To be intimated later

Eligibility Criteria (Brief)

Bidders must:

  • Be registered Indian entities with valid GST, trade licence, and electrical licences
  • Have executed similar rooftop solar projects (minimum 0.5–1 MW capacity)
  • Demonstrate experience in BESS integration (minimum 20 kW / 40 kWh)
  • Meet minimum turnover and working capital requirements

Objective of the Initiative

The tender is aimed at:

  • Expanding distributed rooftop solar capacity in West Bengal
  • Integrating battery storage for improved reliability and load management
  • Supporting decentralised clean energy deployment under RIDF-XXXI

Official Documentation

Detailed technical specifications, financial conditions, timelines, and eligibility requirements are provided in the official NIeT documents issued by WBGEDCL, available through the state e-tendering portal and WBGEDCL’s website .

Tenders

Capacity 3.5 MW Rooftop Solar Tenders with Battery Energy Storage
Location different locations in West Bengal
Last Date 27/02/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
batteryenergystorage BESS India News RenewableEnergyIndia
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

Comments are closed.

Renewable energy
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.