Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Grid » Power Generation (Thermal + Renewable integration) » 1 GW AI Data Centre Planned at South Australia’s Aurora Energy Precinct with 280 MWh BESS
Power Generation (Thermal + Renewable integration)

1 GW AI Data Centre Planned at South Australia’s Aurora Energy Precinct with 280 MWh BESS

Shivangi GuptaBy Shivangi GuptaJuly 31, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
1 GW AI Data Centre Planned at South Australia's Aurora Energy Precinct with 280 MWh BESS
1 GW AI Data Centre Planned at South Australia's Aurora Energy Precinct with 280 MWh BESS

Australian thermal energy storage company 1414 Degrees has signed a Heads of Agreement (HoA) with an undisclosed data centre operator to develop up to 1 GW of AI data centre infrastructure at its Aurora Energy Precinct near Port Augusta, South Australia. The project will combine renewable energy generation, battery energy storage and grid infrastructure to support large-scale AI computing facilities.

Under the agreement, the data centre operator has secured exclusive access to an initial 40-hectare site within Aurora’s 15.8 sq km energy precinct. The location offers up to 900 MW of solar generation potential, an approved 140 MW/280 MWh battery energy storage system (BESS), high-voltage transmission infrastructure, and access to fibre and water.

The project will be developed in three phases. The first phase involves a 17 MW starter campus powered through an existing 33 kV grid connection. The second phase will expand to a 200 MW campus following the completion of a 275 kV transmission connection, while the final phase aims to scale the development to 1 GW as renewable generation capacity at the Aurora precinct increases.

Under the proposed structure, 1414 Degrees will provide land, renewable power, battery storage, grid connectivity and precinct services, while the data centre partner will invest in and operate the AI infrastructure.

The company said it will now negotiate definitive agreements covering land access, behind-the-meter renewable energy supply, battery storage, transmission connectivity and other shared infrastructure. It will also continue working with SA Power Networks and ElectraNet to progress grid connection arrangements.

Executive Chairman Dr Kevin Moriarty said the agreement validates the company’s strategy of attracting energy-intensive industries to a renewable-powered energy hub. He noted that the existing 33 kV connection enables early project development while larger transmission and renewable energy infrastructure are completed.

The announcement follows a significant regulatory milestone achieved in January 2026, when the Australian Energy Market Operator (AEMO) approved the Generator Performance Standards (GPS) for Aurora’s 140 MW/280 MWh BESS. The approval allows the battery system to connect to the grid, finalise transmission agreements and advance commercial power purchase negotiations.

While the site’s anchor battery storage system will use conventional battery technology, the broader Aurora Energy Precinct will also host a pilot deployment of 1414 Degrees’ proprietary SiBox thermal energy storage technology. The company’s molten silicon-based storage system is designed for long-duration energy storage and high-temperature industrial heat applications, complementing battery energy storage rather than replacing it.

The project comes as Australia introduces new regulatory requirements for large-scale data centres, including obligations to support new renewable energy generation and strengthen grid reliability. As demand for AI infrastructure grows, projects integrating renewable energy and energy storage are expected to play a key role in delivering reliable, low-carbon power for next-generation data centres.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS clean energy energy storage energy storage systems global news renewable energy renewable integration wind
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Top EPC Contractors for Energy Storage & Battery Storage Projects in India

Top EPC Contractors for Energy Storage & Battery Storage Projects in India

DST's TDB Backs RoadGrid India to Commercialise Indigenous Universal EV Charging Technology

DST’s TDB Backs RoadGrid India to Commercialise Indigenous Universal EV Charging Technology

Nuclear Power and Battery Storage Will Drive India's Energy Transition, Says NITI Aayog Member VK Saraswat

NITI Aayog VK Saraswat Says Nuclear Energy Will Drive India’s Energy Transition

Leave A Reply Cancel Reply

five × four =

Renewable energy
Nuclear Power and Battery Storage Will Drive India's Energy Transition, Says NITI Aayog Member VK Saraswat

NITI Aayog VK Saraswat Says Nuclear Energy Will Drive India’s Energy Transition

July 31, 2026
Greenvolt Power Commissions 200 MW/800 MWh BESS in Poland, Expands Large-Scale Energy Storage Portfolio

Greenvolt Power Commissions 200 MW/800 MWh BESS in Poland, Expands Large-Scale Energy Storage Portfolio

July 31, 2026
Avaada Group Achieves USD 1.3 Billion Financial Closure for 2.15 GW Renewable Energy Portfolio

Avaada Group Achieves USD 1.3 Billion Financial Closure for 2.15 GW Renewable Energy Portfolio

July 31, 2026
Brookfield Launches Lumara to Accelerate Renewable Energy Development in India

Brookfield Launches Lumara to Accelerate Renewable Energy Development in India

July 31, 2026
Batteries
1 GW AI Data Centre Planned at South Australia's Aurora Energy Precinct with 280 MWh BESS

1 GW AI Data Centre Planned at South Australia’s Aurora Energy Precinct with 280 MWh BESS

July 31, 2026
Tata Power Breaks Ground on 800 MW Renewable Energy Project in Andhra Pradesh with Integrated BESS

Tata Power Breaks Ground on 800 MW Renewable Energy Project in Andhra Pradesh with Integrated BESS

July 31, 2026
Brookfield Unveils Lumara Platform, Commits $600 Million to Scale Renewable Energy and BESS Projects in India

Brookfield Unveils Lumara Platform, Commits $600 Million to Scale Renewable Energy and BESS Projects in India

July 31, 2026
POWERCON Group Appoints Suresh Darade to Lead Renewable Energy Skilling Centre, Strengthens Workforce Development for Clean Energy Sector

POWERCON Group Appoints Suresh Darade to Lead Renewable Energy Skilling Centre, Strengthens Workforce Development for Clean Energy Sector

July 30, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.