Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh
Renewable energy

Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh

Shivangi GuptaBy Shivangi GuptaJuly 16, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh

Assam Power Generation Corporation Ltd. (APGCL) and Oil India Ltd. (OIL)‘s joint venture, AOGPL Oil Green Power Limited (AOGPL), has invited bids to appoint a consultant for the development of a 25 MW/100 MWh Battery Energy Storage System (BESS) at the Namrup Solar Project in Assam. As part of the bidding process, interested bidders are required to pay a non-refundable online tender processing fee of ₹1,000.

Sufficient land is available within the boundary of the Namrup Thermal Power Station, Namrup, where the project is proposed to be developed. AOGPL OIL GREEN POWER LIMITED will develop the project under the supervision of its Chief Executive Officer (CEO). Through this tender, the company is seeking to appoint a consultant for the preparation of a Pre-Feasibility Report (PFR) and Detailed Project Report (DPR).

The joint venture company intends to establish a 25 MW/100 MWh Battery Energy Storage System (BESS). The BESS may be developed as a standalone project or integrated with the upcoming 25 MW Namrup Solar Project. The final capacity of the BESS may vary depending on the technical and financial viability determined through the proposed PFR/DPR.

The latest tender aligns with Assam’s latest budget, which allocated over Rs. 77,353 crore in planned investments across hydro, solar, thermal, and energy storage projects. The 2026-27 budget has also proposed extending the exemption from Electricity Duty on captive consumption of electricity generated from renewable energy sources for a further period of three years, from April 1, 2026, to March 31, 2029.

Under the scope of work, Assam Power Generation Corporation Ltd. (APGCL) requires bidder, an experienced consulting firm selected through the Quality and Cost-Based Selection (QCBS) process. The tender seeks to engage a consultant to prepare a Pre-Feasibility Report (PFR) and Detailed Project Report (DPR) for the solar-plus-storage project.

Conducting a site assessment, creating basic technical design drawings and specifications, creating a financial model and analysis, performing a risk assessment and mitigation plan, creating an implementation timeline and execution plan, and creating an Operations and Maintenance (O&M) plan are all included in the scope of work.

For at least one Battery Energy Storage System (BESS) with a capacity of at least 100 MWh, the tenderer must have experience offering consulting services for the feasibility study and preparation of a DFR/DPR within the previous five years from the first bid deadline. Experience with a government agency, PSU, CPSU, municipal board, or a comparable institution is required.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
AOGPL Assam Power Generation Corporation Ltd Battery Energy Storage System (BESS) India News Namrup Solar Project. Oil India Ltd
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Utility scale Battery Projects in India

When the Sun Sets, Batteries Rise: Utility-Scale Battery Projects in India

XAVOLT Energy Signs MoU with DRIIV to Advance Affordable Battery Energy Storage Solutions

XAVOLT Energy Signs MoU with DRIIV to Advance Affordable Battery Energy Storage Solutions

SECI Concludes 2,000 MW ISTS-Connected Wind Power Auction Under Tranche-XX

SECI Concludes 2,000 MW ISTS-Connected Wind Power Auction Under Tranche-XX

Leave A Reply Cancel Reply

eighteen + 14 =

Renewable energy
Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh

Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh

July 16, 2026
XAVOLT Energy Signs MoU with DRIIV to Advance Affordable Battery Energy Storage Solutions

XAVOLT Energy Signs MoU with DRIIV to Advance Affordable Battery Energy Storage Solutions

July 16, 2026
SECI Concludes 2,000 MW ISTS-Connected Wind Power Auction Under Tranche-XX

SECI Concludes 2,000 MW ISTS-Connected Wind Power Auction Under Tranche-XX

July 16, 2026
Hitachi Energy Wins First-Ever 165 MW/330 MWh BESS Project in India

Hitachi Energy Wins First-Ever 165 MW/330 MWh BESS Project in India

July 16, 2026
Batteries
Masdar has completed the financial closing of its $6.1 billion 5.2 GW solar and 19 GWh BESS project

Masdar has completed the financial closing of its $6.1 billion 5.2 GW solar and 19 GWh BESS project

July 16, 2026
Atria University and MiniMines Collaborate to Develop AI-guided Key Mineral Recovery From Wasted Batteries.

Atria University and MiniMines Collaborate to Develop AI-guided Key Mineral Recovery From Wasted Batteries.

July 16, 2026
Amara Raja Commissions Customer Qualification Battery Cell Plant in Telangana

Amara Raja Commissions Customer Qualification Battery Cell Plant in Telangana

July 16, 2026
10 GWh ACC Battery Manufacturing

The Ministry of Heavy Industries Floats Global Tender for 10 GWh ACC Battery Manufacturing Under PLI Scheme

July 15, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.