Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Grid » Transmission & Distribution » Chhattisgarh Discom Disconnects Power to 747 Government Offices Over Rs 12.83 Crore Dues
Transmission & Distribution

Chhattisgarh Discom Disconnects Power to 747 Government Offices Over Rs 12.83 Crore Dues

Shivangi GuptaBy Shivangi GuptaSeptember 22, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Chhattisgarh Discom Disconnects Power to 747 Government Offices Over Rs 12.83 Crore Dues

The state power distribution company (Discom) in Chhattisgarh has launched a major drive against outstanding electricity dues and non-compliance with smart prepaid metering requirements, disconnecting power connections of government departments with unpaid bills.

The Discom disconnected electricity supplies to 747 government offices across several districts within a week over unpaid dues and metering-related non-compliance. The action prompted several government offices to take immediate steps to settle their outstanding electricity bills.

Following the disconnections, 417 of the affected offices cleared their pending dues, enabling the power utility to recover ₹4.43 crore. The 747 disconnected connections had accumulated total outstanding dues of ₹12.83 crore, with some government offices reportedly remaining unpaid for several months and, in certain cases, more than a year.

Across the state, government departments have accumulated pending electricity bills exceeding Rs 3,000 crore, with several agencies defaulting on payments for over two years, officials said.
The Urban Administration and Development Department tops the list of defaulters with unpaid bills exceeding Rs 1,200 crore. Other major defaulters owing crores of rupees include the Panchayat and Rural Development Department, Public Health Engineering (PHE), School Education, Forest, Health, and Scheduled Caste Welfare departments.
The enforcement drive also stems from administrative compulsion under the Central Government’s Revamped Distribution Sector Scheme (RDSS). Under this scheme, the next installment of central funds remains frozen until state government offices systematically clear their overdue power bills.
Departments have showed little interest in switching to the required prepaid format, even though 80% of government connections have been modernized with smart meters. Only Rs 1.5 crore in prepayments have been received thus far, despite the discom’s announcement that government smart meters would transition to prepaid mode on August 1. Departments have routinely disregarded reminders, leading the discom management to use broad disconnections despite the possibility to pay arrears in installments along with prepaid recharges.
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Chhattisgarh Discom Electricity Dues Government Offices India News power distribution Smart Prepaid Metering
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

WAAREE TRANSPOWER Appoints Neeraj Goyal as Chief Executive Officer

WAAREE TRANSPOWER Appoints Neeraj Goyal as Chief Executive Officer

WAAREE TRANSPOWER Appoints Rahul Chauhan as Vice President – Sales

WAAREE TRANSPOWER Appoints Rahul Chauhan as Vice President – Sales

Avaada Group Elevates Altaf Tamboli to Vice President

Avaada Group Elevates Altaf Tamboli to Vice President

Leave A Reply Cancel Reply

four + nineteen =

Renewable energy
WAAREE TRANSPOWER Appoints Neeraj Goyal as Chief Executive Officer

WAAREE TRANSPOWER Appoints Neeraj Goyal as Chief Executive Officer

September 22, 2026
WAAREE TRANSPOWER Appoints Rahul Chauhan as Vice President – Sales

WAAREE TRANSPOWER Appoints Rahul Chauhan as Vice President – Sales

September 22, 2026
Avaada Group Elevates Altaf Tamboli to Vice President

Avaada Group Elevates Altaf Tamboli to Vice President

September 22, 2026
Sterling and Wilson Renewable Energy Secures Rs 985 Crore Orders in India and South Africa

Sterling and Wilson Renewable Energy Secures Rs 985 Crore Orders in India and South Africa

September 22, 2026
Batteries
Exide Energy International Enters Long-Term Cooperation Agreement With ExCom Energy Solutions

Exide Energy International Enters Long-Term Cooperation Agreement With ExCom Energy Solutions

September 22, 2026
Attero Operationalises Greater Noida R&D Centre to Advance Critical Mineral Recovery Technologies

Attero Operationalises Greater Noida R&D Centre to Advance Critical Mineral Recovery Technologies

September 22, 2026
MSEDCL Awards 2 GW/4 GWh BESS Capacity at Rs 2.38–2.40 Lakh/MW/Month

MSEDCL Awards 2 GW/4 GWh BESS Capacity at Rs 2.38–2.40 Lakh/MW/Month

September 22, 2026
LG Energy Solution’s BESS Qualifies as NVIDIA DSX Ready BESS

LG Energy Solution’s BESS Qualifies as NVIDIA DSX Ready BESS

September 22, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.