Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Cosmic PV Power Secures Second 200 MW Solar Module Order from Zetwerk, Plans 2 GW BESS Assembly Line
Battery Manufacturing (BESS)

Cosmic PV Power Secures Second 200 MW Solar Module Order from Zetwerk, Plans 2 GW BESS Assembly Line

Shivangi GuptaBy Shivangi GuptaNovember 26, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Cosmic PV Power Secures Second 200 MW Solar Module Order from Zetwerk, Plans 2 GW BESS Assembly Line

Cosmic PV Power Limited has secured a second order for the supply of 200 MW of solar modules from Zetwerk Manufacturing Businesses Limited, strengthening its presence in India’s utility-scale solar manufacturing sector. The repeat order reflects the company’s growing participation in large-scale renewable energy projects and its expanding relationships across India’s solar supply chain.

The latest order builds on Cosmic PV Power’s earlier engagement with Zetwerk and highlights its manufacturing capabilities in meeting high-volume solar module requirements. The company is focusing on expanding its production infrastructure, dedicated manufacturing lines and product quality to serve utility-scale projects and Independent Power Producers (IPPs).

Cosmic PV Power Expands Renewable Energy Manufacturing Business

Commenting on the development, Jenish Ghael, Chairman and Co-Founder of Cosmic PV Power Limited, said that expanding the company’s presence in the utility-scale solar segment has been an important part of its long-term growth strategy. He added that repeat business from established industry players such as Zetwerk reflects progress in strengthening its manufacturing capabilities and customer relationships.

Shravan Gupta, Managing Director and Co-Founder of Cosmic PV Power Limited, highlighted the importance of manufacturing capacity, product quality, supply chain coordination and timely execution in serving large-scale solar projects. He added that the repeat order demonstrates the company’s readiness to expand its participation in the utility-scale and IPP segments.

Cosmic PV Power Plans 2 GW BESS Assembly Line

Alongside its solar module manufacturing business, Cosmic PV Power is expanding into the battery energy storage system (BESS) segment through a planned 2 GW BESS assembly line.

According to the company, commercial operations at the proposed assembly line are expected to commence in December 2026. The expansion is aimed at strengthening its presence in the energy storage manufacturing value chain.

The Cosmic Group is also expanding its Energy EPC business as part of its strategy to develop an integrated renewable energy solutions portfolio.

Headquartered in Surat, Gujarat, Cosmic PV Power Limited is a solar photovoltaic (PV) module manufacturer established in 2020. The company has been expanding its manufacturing capabilities, technology portfolio and presence across India’s renewable energy sector.

With its planned entry into BESS assembly and expansion of its Energy EPC business, Cosmic PV Power is looking to strengthen its position across solar manufacturing, battery storage and renewable energy infrastructure.

The planned 2 GW BESS assembly line marks the company’s next step towards participating in India’s growing battery storage manufacturing ecosystem.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS manufacturing Cosmic PV Power India News renewable energy solar manufacturing Zetwerk
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Power Ministry Proposes Mandatory Battery Storage for Rooftop Solar Systems Above 10 kW

Power Ministry Proposes Mandatory Battery Storage for Rooftop Solar Systems Above 10 kW

ACME Solar Commissions 255.12 MWh Battery Storage System for NHPC Renewable Energy Project

ACME Solar Commissions 255.12 MWh Battery Storage System for NHPC Renewable Energy Project

Hindustan Zinc and IIT Madras Develop 1 kWh Zinc-Air Battery for Electric Three-Wheeler

Hindustan Zinc and IIT Madras Develop 1 kWh Zinc-Air Battery for Electric Three-Wheeler

Leave A Reply Cancel Reply

16 − two =

Renewable energy
ACME Solar Commissions 255.12 MWh Battery Storage System for NHPC Renewable Energy Project

ACME Solar Commissions 255.12 MWh Battery Storage System for NHPC Renewable Energy Project

November 26, 2026
Diamond Power Secures ₹488 Crore Orders for Conductors for Bhadla-Fatehpur HVDC Renewable Energy Corridor

Diamond Power Secures ₹488 Crore Orders for Conductors for Bhadla-Fatehpur HVDC Renewable Energy Corridor

November 26, 2026
Cosmic PV Power Secures Second 200 MW Solar Module Order from Zetwerk, Plans 2 GW BESS Assembly Line

Cosmic PV Power Secures Second 200 MW Solar Module Order from Zetwerk, Plans 2 GW BESS Assembly Line

November 26, 2026
Vena Energy Secures US$113 Million Green Loan to Refinance 114 MW Renewable Energy Portfolio in Indonesia

Vena Energy Secures US$113 Million Green Loan to Refinance 114 MW Renewable Energy Portfolio in Indonesia

November 26, 2026
Batteries
Power Ministry Proposes Mandatory Battery Storage for Rooftop Solar Systems Above 10 kW

Power Ministry Proposes Mandatory Battery Storage for Rooftop Solar Systems Above 10 kW

November 26, 2026
Hindustan Zinc and IIT Madras Develop 1 kWh Zinc-Air Battery for Electric Three-Wheeler

Hindustan Zinc and IIT Madras Develop 1 kWh Zinc-Air Battery for Electric Three-Wheeler

November 26, 2026
Rajasthan Sets November 2027 Deadline for Completion of 6,000 MWh BESS Projects

Rajasthan Sets November 2027 Deadline for Completion of 6,000 MWh BESS Projects

November 26, 2026
UPERC Approves ₹6.46/kWh Tariff for 125 MW/500 MWh BESS Project in Uttar Pradesh

UPERC Approves ₹6.46/kWh Tariff for 125 MW/500 MWh BESS Project in Uttar Pradesh

November 26, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.