Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Envision Energy, ju:niz Energy Expand Collaboration with 442 MWh BESS Project in Germany
Battery Manufacturing (BESS)

Envision Energy, ju:niz Energy Expand Collaboration with 442 MWh BESS Project in Germany

Shivangi GuptaBy Shivangi GuptaNovember 10, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
Envision Energy, ju:niz Energy Expand Collaboration with 442 MWh BESS Project in Germany

Envision Energy, a global green technology leader, and ju Energy are strengthening their partnership through the 442 MWh Smareg 13 (Vöhringen II) battery energy storage system (BESS) project in Bavaria, Germany. The project represents a significant milestone in their collaboration and will support the continued expansion of large-scale energy storage capacity across Germany.

Smareg 13 is the third project jointly realized by Envision and ju:niz Energy, bringing the total volume of their collaboration to nearly 600 MWh. The growing scale of the partnership reflects the strong collaboration between the two companies, combining ju:niz Energy’s expertise in the development and long-term operation of large-scale battery storage projects with Envision Energy’s BESS technology and project delivery capabilities.

ju:niz Energy is responsible for the development, financing and realization of Smareg 13 and will operate the battery storage system over the long term. The project forms part of ju:niz Energy’s growing German BESS portfolio and reflects the company’s strategy of developing, financing, building and operating large-scale storage infrastructure across the full project lifecycle.

Smareg 13 will deploy Envision’s advanced Gen 8 BESS platform, combining four-hour energy storage, advanced battery technology and grid-forming capabilities to deliver high-performance energy storage and enhanced grid support. Its leading low-noise design enables deployment in acoustically sensitive environments without compromising operational capability, addressing one of the key site challenges for Smareg 13. Located adjacent to the operational Smareg 12 facility, the project will further strengthen storage capacity in Bavaria, providing greater flexibility and balancing capability as Germany integrates a growing share of renewable energy.

Henry Peng, Senior Vice President, Envision Energy & President of EU & LATAM Regions said: “The continued expansion of our partnership with ju:niz reflects the trust built through close cooperation and consistent execution. Moving forward with a significantly larger project before our first two projects have completed delivery demonstrates Envision’s role as a trusted long-term technology partner. With Smareg 13, we are bringing together our Gen 8 BESS technology and expanding local capabilities in Germany to help build the flexible, resilient energy infrastructure required for the country’s next phase of renewable energy growth.”

“With Smareg 13, we are taking another major step in the development of our battery storage portfolio,” said Vural Oezcan, COO at ju:niz Energy, “The project combines a very advanced development status with four-hour storage technology and will make an important contribution to flexibility and system stability. Envision has proven to be a strong technology partner in our existing cooperation, and we are pleased to expand this collaboration with a project of this scale.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Battery Energy Storage System energy storage Envision Energy Germany BESS global news ju:niz Energy
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Reliance Industries Expands ALMM-II Enlisted HJT Solar Cell Capacity to 3.37 GW

Reliance Industries Expands ALMM-II Enlisted HJT Solar Cell Capacity to 3.37 GW

Sodium-Ion Batteries Gain Commercial Momentum with 70 GWh Supply Agreements, Wood Mackenzie Finds

Sodium-Ion Batteries Gain Commercial Momentum with 70 GWh Supply Agreements, Wood Mackenzie Finds

GUVNL Floats 250 MW Wind Power Tender With 250 MW Greenshoe Option

GUVNL Floats 250 MW Wind Power Tender With 250 MW Greenshoe Option

Leave A Reply Cancel Reply

four × 1 =

Renewable energy
Reliance Industries Expands ALMM-II Enlisted HJT Solar Cell Capacity to 3.37 GW

Reliance Industries Expands ALMM-II Enlisted HJT Solar Cell Capacity to 3.37 GW

November 10, 2026
VILVA Expands Global Distribution Network for Load Banks and Power Testing Solutions

VILVA Expands Global Distribution Network for Load Banks and Power Testing Solutions

November 10, 2026
Risen Celebrates 18 Years in Australia with 500Wp HJT Solar Module Launch

Risen Celebrates 18 Years in Australia with 500Wp HJT Solar Module Launch

November 10, 2026

Avaada Group Showcases Integrated Clean Energy Vision at Bharat RE Summit 2026

November 10, 2026
Batteries
Sodium-Ion Batteries Gain Commercial Momentum with 70 GWh Supply Agreements, Wood Mackenzie Finds

Sodium-Ion Batteries Gain Commercial Momentum with 70 GWh Supply Agreements, Wood Mackenzie Finds

November 10, 2026
Solidion Technology Reports $244,000 Net Income in Q3 2026, Cuts Liabilities by 40%

Solidion Technology Reports $244,000 Net Income in Q3 2026, Cuts Liabilities by 40%

November 10, 2026
Envision Energy, ju:niz Energy Expand Collaboration with 442 MWh BESS Project in Germany

Envision Energy, ju:niz Energy Expand Collaboration with 442 MWh BESS Project in Germany

November 10, 2026
Tata Power Deploys 60 MWh BESS to Boost Mumbai’s Grid Reliability

Tata Power Deploys 60 MWh BESS to Boost Mumbai’s Grid Reliability

November 10, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.