Madhya Pradesh Chief Minister Mohan Yadav has inaugurated the first operational unit of Greenko Group’s ₹11,500 crore Gandhi Sagar Pumped Hydro Storage Project in Neemuch district, Madhya Pradesh. The nine-unit project has a planned installed capacity of 1,920 MW and is designed to provide power during peak demand periods.
Developed by Greenko Group, the project is expected to supply up to 2,000 MW of peak power, supporting Madhya Pradesh’s electricity requirements and improving grid flexibility. The facility is designed to generate electricity at full capacity for six continuous hours.
The pumped hydro storage project uses two reservoirs, with the existing Gandhi Sagar reservoir serving as the lower reservoir. The system will circulate approximately 2.4 TMC of water between the reservoirs. During periods of surplus electricity, including renewable energy generation from solar and wind, water will be pumped to the upper reservoir. During peak demand, stored water will be released through turbines to generate electricity.
The project is expected to play a role in balancing electricity supply and demand by storing surplus power and making it available during high-demand hours. Pumped hydro storage can support renewable energy integration by helping manage fluctuations in solar and wind generation.
The inauguration marks progress in Madhya Pradesh’s energy storage infrastructure, as the state looks to strengthen peak power availability and support a more flexible electricity grid.





