Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh
Tenders

POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh

Shivangi GuptaBy Shivangi GuptaNovember 18, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh

Power Grid Corporation of India Limited (POWERGRID) has invited bids for developing a 100 MW/400 MWh battery energy storage system (BESS) at the NP Kunta Renewable Energy Project in Andhra Pradesh. The project will be implemented under the Build-Own-Operate (BOO) model through the Tariff-Based Competitive Bidding (TBCB) framework.

Identified as Package AP BESS 06 and Lot 6, the project forms part of Andhra Pradesh’s larger plan to develop 1,250 MW/5,000 MWh of battery energy storage capacity. The initiative aims to strengthen the state’s power infrastructure and support the integration of renewable energy into the grid.

The proposed facility will have a four-hour storage duration. The selected developer will be responsible for the design, supply, erection, testing, commissioning, operation and maintenance of the BESS facility.

Under the BOO arrangement, the successful bidder will develop, own and operate the storage project in accordance with POWERGRID’s tender requirements. The project is expected to improve grid flexibility by storing electricity when renewable generation is available and supplying it during periods of higher demand or lower generation.

POWERGRID BESS Tender: Key Details

The tender has been published on POWERGRID’s PRANIT e-tendering portal under RFX Number 5002005830 and tender reference number CC/T/W-BESS/DOM/A01/26/15301.

The tender fee is ₹25,000, while the tender value and Earnest Money Deposit (EMD) are listed as zero in the available notification details.

Key procurement details include:

  • Organisation: Power Grid Corporation of India Limited (POWERGRID)
  • Project Location: NP Kunta Renewable Energy Project, Andhra Pradesh
  • Capacity: 100 MW/400 MWh
  • Package: AP BESS 06
  • Lot: Lot 6
  • RFX Number: 5002005830
  • Tender Reference: CC/T/W-BESS/DOM/A01/26/15301
  • Tender Fee: ₹25,000
  • Tender Value: Listed as zero
  • EMD: Listed as zero
  • Bidding Framework: Tariff-Based Competitive Bidding (TBCB)
  • Implementation Model: Build-Own-Operate (BOO)
  • Last Date to Purchase Tender Documents: November 21, 2026, at 11:55 PM
  • Bid Submission Deadline: November 23, 2026, at 11:00 AM
  • Bid Opening: November 23, 2026, at 11:30 AM
  • Tender-Inviting Officer: Kapil Mandil, Deputy General Manager

Interested bidders can access the tender documents through POWERGRID’s PRANIT e-tendering portal.

BESS Expansion to Support Renewable Energy Integration

The tender comes as Andhra Pradesh looks to expand its energy storage infrastructure alongside increasing renewable energy deployment. Battery storage systems can help address the variability of solar and wind generation by storing surplus electricity and releasing it when generation falls or demand rises.

The proposed 100 MW/400 MWh project will contribute to the state’s broader 1,250 MW/5,000 MWh storage programme, supporting greater grid flexibility and the utilisation of renewable power.

Power Grid Corporation of India Limited (POWERGRID) is a Maharatna public sector undertaking under the Ministry of Power, Government of India. It operates one of the country’s largest electricity transmission networks, connecting power generation sources with distribution utilities and consumers. The company is also expanding its activities into emerging areas such as battery energy storage systems.

Capacity 100 MW/400 MWh
Location NP Kunta Renewable Energy Project, Andhra Pradesh
Last Date 23/11/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Andhra Pradesh Battery Energy Storage System BESS tender energy storage India News POWERGRID
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Tata Steel plans hydrogen production project using steel plant off-gases at Kalinganagar, Odisha

Tata Steel plans hydrogen production project using steel plant off-gases at Kalinganagar, Odisha

FranklinWH Energy Storage Inc. Launches Virtual Power Plant Service at RE+

FranklinWH Energy Storage Inc. Launches Virtual Power Plant Service at RE+

U.S. Energy Storage Installations Surpass 200 GWh Milestone

U.S. Energy Storage Installations Surpass 200 GWh Milestone

Leave A Reply Cancel Reply

two × 1 =

Renewable energy
Tata Steel plans hydrogen production project using steel plant off-gases at Kalinganagar, Odisha

Tata Steel plans hydrogen production project using steel plant off-gases at Kalinganagar, Odisha

November 18, 2026
U.S. Energy Storage Installations Surpass 200 GWh Milestone

U.S. Energy Storage Installations Surpass 200 GWh Milestone

November 18, 2026
ADB, Bangladesh Expand Partnership to Develop 1,000 MW of Solar and Battery Storage

ADB, Bangladesh Expand Partnership to Develop 1,000 MW of Solar and Battery Storage

November 18, 2026
Haryana Increases Solar Subsidy Limit to 30 kW for Shrimp Farmers

Haryana Increases Solar Subsidy Limit to 30 kW for Shrimp Farmers

November 18, 2026
Batteries
FranklinWH Energy Storage Inc. Launches Virtual Power Plant Service at RE+

FranklinWH Energy Storage Inc. Launches Virtual Power Plant Service at RE+

November 18, 2026
POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh

POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh

November 18, 2026
ACME Solar Signs 150 MW Hybrid Power PPA with NTPC at ₹3.21 per Unit

ACME Solar Signs 150 MW Hybrid Power PPA with NTPC at ₹3.21 per Unit

November 18, 2026
Create Energy Partners with Ampt to Expand ONTRACK Solar and BESS Solutions

Create Energy Partners with Ampt to Expand ONTRACK Solar and BESS Solutions

November 18, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.