The Battery Magazine Logo

Subscribe to The Battery Magazine's Current Newsletter & never miss an update!

    Close Menu
    The Battery MagazineThe Battery Magazine
    • Home
    • Batteries
      • EV & Automotive
      • Portable Power
      • Stationary & Industrial
    • Charging
    • Manufacturing & Materials
    • Events
    Facebook X (Twitter) Instagram
    The Battery MagazineThe Battery Magazine
    • Home
    • Batteries
      • EV & Automotive
      • Portable Power
      • Stationary & Industrial
    • Charging
    • Manufacturing & Materials
    • Events
    LinkedIn Facebook
    The Battery MagazineThe Battery Magazine
    Home » Haryana Fast Transport Plans to Install Charging Infrastructure for EVs

    Haryana Fast Transport Plans to Install Charging Infrastructure for EVs

    aishwaryaBy aishwaryaJuly 21, 2022 Charging Stations 2 Mins Read
    Facebook Twitter LinkedIn WhatsApp
    charging infrastructure

    The Haryana Mass Fast Transport Company (HMRTC) has revealed its intentions to establish charging infrastructure for electrical automobiles and provides out industrial areas in stations on the Fast Metro line to extend their income.

    charging infrastructure Officers mentioned that the 11.7km line, which hyperlinks Cyber Metropolis to the Golf Course Highway, information a median footfall of solely 32,307 passengers’ day by day.

    HMRTC has floated a tender to arrange EV charging and battery swapping services at 7 Fast Metro stations — Sector 55-56, Sector 54 Chowk, Sector 42-43, Part 1, Sikanderpur, Belvedere Towers and Moulsari Avenue.

    Two slots will probably be offered on the Part 1 metro station, and 5 will probably be offered on the remaining six stations.

    “We’ll simply be offering the location for the work, which is to be executed by the company. They might want to take the required approvals from businesses and fulfill all compliances. We will facilitate this course of, however, we won’t be taking the approvals on their behalf,” mentioned a senior HMRTC official.

    About 243sqm space will probably be out there for leasing out on the Part 1 station, 265 and 221 sq. meters will probably be offered on the Sector 42-43 and Sector 53-54 metro stations, respectively.

    “Our finish aim with all of that is to extend the income generated from this specific line. Aside from that, the EV charging infrastructure and leasing out of areas on this method will even improve the exercise and footfall on the stations, which we hope will translate into ridership as nicely,” mentioned the official quoted above.

    “Proper now, the ridership is kind of low, so we’re taking all attainable measures to draw folks. It is going to enable them to turn out to be extra conscious and acutely aware of the power, and extra open to utilizing the metro line,” he mentioned.

    The most important space offered will probably be on the Sector 54 Chowk station, the place 365.6 sqm will probably be out there. On the Sector 55-56 metro station, 265 sqm will probably be leased.

    businesses Cyber Metropolis EV charging infrastructure Fast Metro stations Haryana Mass Fast Transport Company (HMRTC) news
    aishwarya

    More article from aishwarya

    Keep Reading

    Atmoce Launches Retrofit-Ready Home Battery

    PG&E Launches Streamlined Service to Accelerate EV Charger, Fleet, and Battery Grid Connections

    XCharge Showcases Revolutionary Battery-Integrated Charging Solution at EVIS 2025

    Leave A Reply Cancel Reply

    nine − 4 =

    MANUFACTURING & MATERIALS

    Himadri Partners with Australia’s Sicona to Bring High-Efficiency SiCx Anode Technology to India

    May 14, 2025

    BASF and Group14 collaborate on market-ready silicon anode solution that is highly durable at extreme temperatures

    May 14, 2025

    Saft Launches Intensium Flex Battery Storage Container

    May 13, 2025

    Aeson Power Launches Sodium Battery Innovation at EES Europe 2025

    May 9, 2025
    Batteries

    Aypa Power Secures $535 million For California Project

    May 14, 2025

    Eku Energy Secures Debt For New Ocker Hill BESS

    May 14, 2025

    Masdar 500 MW Baseload Green Power Project in Kazakhstan

    May 14, 2025

    Waaree Investment of USD 200m In US Energy Storage

    May 14, 2025

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

      © 2025 Thebatterymagazine.
      • Home
      • About Us
      • Contact Us
      • Privacy Policy
      • Terms of Service

      Type above and press Enter to search. Press Esc to cancel.