Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » Solar Tender » HPPCL Floats Tender for 9 MW Solar Project with 6.3 MWh BESS in Himachal Pradesh
Solar Tender

HPPCL Floats Tender for 9 MW Solar Project with 6.3 MWh BESS in Himachal Pradesh

Shweta KumariBy Shweta KumariApril 6, 20261 Min Read
Facebook Twitter LinkedIn WhatsApp
Himachal Floats Solar Battery Project Tender in Solan

Himachal Pradesh Power Corporation Limited (HPPCL) has invited bids for the development of a 9 MW solar photovoltaic project integrated with a 6.3 MWh Battery Energy Storage System (BESS) at Dabhota in Solan district.

The project is designed as a solar-plus-storage hybrid system, comprising 9 MW (AC) solar capacity along with a 3.15 MW / 6.3 MWh battery storage system, aimed at ensuring reliable and dispatchable renewable power.

Project Scope

The tender covers complete engineering, procurement, and construction (EPC) of the project, including:

  • Design, engineering, and project planning
  • Supply of solar and BESS components
  • Installation, testing, and commissioning
  • Grid connectivity and system integration
  • Comprehensive operation and maintenance (O&M) for 15 years

Technical Configuration

  • Solar Capacity: 9 MW (AC)
  • Battery Storage: 3.15 MW / 6.3 MWh
  • Project Type: Solar + Storage Hybrid
  • Application: Grid support, peak management, and improved dispatchability

Tender Details

  • Bid Submission Deadline: May 5, 2026
  • Bidding Format: Single-stage, two-envelope
  • Selection Method: Reverse auction

Location

  • Project Site: Dabhota (Dabhota-I)
  • District: Solan
  • State: Himachal Pradesh
Capacity 9 MW Solar Project with 6.3 MWh BESS
Location Dabhota (Dabhota-I), Solan, Himachal Pradesh
Last Date 05/05/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS India energy storage EPC tender grid storage Renewable Energy India solar-plus-storage
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

CATL

CATL Launches World’s Largest Energy Storage Validation Facility

TERI

TERI Hosts Stakeholder Consultation on CSP-TES to Advance Dispatchable Renewable Energy

Leave A Reply Cancel Reply

16 + 9 =

Renewable energy
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Kyro Capital

Kyro Capital Launches ₹100 Crore Pre-IPO Fund Targeting Renewable Energy and Growth Sectors

June 3, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.