Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Grid » JSW Energy Orders 1,600 MW Turbine Generators for Salboni Project
Grid

JSW Energy Orders 1,600 MW Turbine Generators for Salboni Project

Shivangi GuptaBy Shivangi GuptaSeptember 25, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
JSW Energy Orders 1,600 MW Turbine Generators for Salboni Project

JSW Thermal Energy Limited, a wholly owned subsidiary of JSW Energy Limited, has entered into a contract with its associate company, Toshiba JSW Power Systems Private Limited, to procure two 800 MW steam turbine generators for Phase 2 of the Salboni Thermal Project in West Bengal.

With this order, the Company has completed the placement of turbine-generator equipment orders for the entire 3,200 MW (4 x 800 MW) Salboni Thermal Power Project (Salboni TPP), following the earlier order for Phase 1 (2 x 800 MW) units.

The turbine-generator package will be manufactured and supplied in line with the project’s construction schedule, supporting timely completion and commissioning of the plant. By sourcing key equipment through an associate company, the Company aims to enhance supply-chain certainty, improve coordination during execution, and reduce risks arising from industry-wide equipment shortages.

JSW Energy currently has an installed thermal generation capacity of 5,958 MW and 5,000 MW under construction capacity, comprising 3,200 MW at Salboni and 1,800 MW at JSW Mahanadi Power Company Limited (JMPCL).

Sharad Mahendra, Joint Managing Director and CEO of JSW Energy
“Our second turbine generator contract with Toshiba JSW fully secures the TG requirement for the entire 3,200 MW at Salboni, our largest single-location thermal asset, and keeps both phases firmly on track for timely completion at a time when critical equipment supply remains tight. This builds on our partnership with Toshiba, which dates back to 2008, and on JSW Energy’s clear right to win in thermal power: proven delivery of large sized thermal projects, a healthy balance sheet, and early securing of fuel, land, and key equipment. Salboni TPP will provide reliable baseload power alongside India’s renewable expansion, and it contributes directly to the nation’s roadmap of adding nearly 100 GW of thermal capacity for Atmanirbhar Bharat.”

JSW Energy has a total locked-in generation capacity of 32.4 GW comprising 15.0 GW operational and 13.4 GW under construction across thermal, hydro, and renewables along with a pipeline of 4.0 GW. Locked-in energy storage capacity stands at 29.6 GWh, comprising 26.4 GWh of pumped hydro storage and 3.2 GWh of battery energy storage positioning the Company to supply firm, round-the-clock power as the sector shifts from energy to dispatchability.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
India News JSW Energy JSW Thermal Salboni Thermal Project thermal power India Toshiba JSW
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

DoGo Power Unveils Grid-Forming ESS Portfolio for C&I and Utility Projects

DoGo Power Unveils Grid-Forming ESS Portfolio for C&I and Utility Projects

Tata Power Renewable Energy Appoints Shashank Jalani as Group Head – Brand Marketing

Tata Power Renewable Energy Appoints Shashank Jalani as Group Head – Brand Marketing

Rubamin Strengthens India’s Critical Minerals Recycling Ecosystem

Rubamin: Pioneering India’s Circular Economy in Critical Minerals for Lithium Batteries

Leave A Reply Cancel Reply

13 − nine =

Renewable energy
Tata Power Renewable Energy Appoints Shashank Jalani as Group Head – Brand Marketing

Tata Power Renewable Energy Appoints Shashank Jalani as Group Head – Brand Marketing

September 25, 2026
Waaree Energies to Merge Indosolar in Rs 950 Crore Deal, Integrating Solar Cell and Module Operations

Waaree Energies to Merge Indosolar in Rs 950 Crore Deal, Integrating Solar Cell and Module Operations

September 25, 2026
Envision Energy Unveils Model T EN175/8.0 Onshore Wind Turbine for Enhanced Plant Performance

Envision Energy Unveils Model T EN175/8.0 Onshore Wind Turbine for Enhanced Plant Performance

September 25, 2026
Purvah Green Power Signs First C&I Deal with Prism Johnson for 49.5 MW Wind Project

Purvah Green Power Signs First C&I Deal with Prism Johnson for 49.5 MW Wind Project

September 25, 2026
Batteries
DoGo Power Unveils Grid-Forming ESS Portfolio for C&I and Utility Projects

DoGo Power Unveils Grid-Forming ESS Portfolio for C&I and Utility Projects

September 25, 2026
AlphaESS Launches AlphaQ in Benelux 

AlphaESS Launches AlphaQ in Benelux 

September 25, 2026
IESA Launches ‘BESS for C&I’ to Accelerate India’s Commercial Storage Push

IESA Launches ‘BESS for C&I’ to Accelerate India’s Commercial Storage Push

September 25, 2026
ESR Makes Clean Energy Push with Aquila Deal

ESR Makes Clean Energy Push with Aquila Deal

September 25, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.