Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Wind Energy » Juniper Green Energy Commissions 15.5 MW Wind Capacity, Operational Portfolio Reaches 2,740 MW
Wind Energy

Juniper Green Energy Commissions 15.5 MW Wind Capacity, Operational Portfolio Reaches 2,740 MW

Shivangi GuptaBy Shivangi GuptaOctober 3, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Juniper Green Energy Commissions 15.5 MW Wind Capacity, Operational Portfolio Reaches 2,740 MW

Juniper Green Energy Limited has commissioned an additional 15.5 MW of wind power capacity through its wholly owned subsidiary, Juniper Green Stellar Private Limited. With this addition, the subsidiary’s project-specific operational capacity has increased to 368.95 MWp, while the company’s total operational renewable energy portfolio has reached approximately 2,740 MWp across India.

The company’s operational Battery Energy Storage System (BESS) capacity currently stands at 603 MWh. The latest wind capacity addition forms part of its ongoing expansion of renewable energy projects, including firm and dispatchable renewable energy developments.

The newly commissioned capacity is part of a phased rollout associated with the subsidiary’s 200 MW Firm and Dispatchable Renewable Energy project, which has a planned capacity of 550.6 MWp.

Before the latest commissioning, Juniper Green Stellar’s operational project capacity stood at 353.45 MWp. The addition of 15.5 MW has increased this figure to 368.95 MWp. At the group level, operational capacity has grown from approximately 2,725 MWp to 2,740 MWp.

In September 2026, Juniper Green Energy commissioned 100.64 MWh of BESS capacity at Bikaner, taking its total operational battery storage capacity to approximately 600 MWh at that time. During the same month, the company also fully commissioned a 75 MW hybrid project with Tata Power and reported partial commissioning of wind projects across Gujarat, Maharashtra and Rajasthan.

With the latest addition, Juniper Green Energy’s operational portfolio comprises approximately 2,740 MWp of renewable energy capacity and 603 MWh of battery energy storage capacity.

Juniper Green Energy Limited is a leading independent renewable energy power producer (IPP) in India that listed on the National Stock Exchange (NSE) in August 2026. Incorporated in 2011 and initiating its utility-scale asset development in October 2018, the company ranks among India’s top 10 largest renewable IPPs by total capacity.
The company is headquartered in South Delhi, India, and operates as an end-to-end green energy developer. It manages the entire project lifecycle—from land acquisition and grid connectivity to engineering, procurement, construction (EPC), and long-term operations and maintenance (O&M).

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage India India News Juniper Green Energy renewable energy wind power
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

China Connects 100 MW/1,000 MWh Compressed CO₂ Energy Storage Project to Grid

China Connects 100 MW/1,000 MWh Compressed CO₂ Energy Storage Project to Grid

UN Welcomes India’s Green Energy Corridor Phase-III, Highlights Role of Battery Storage

UN Welcomes India’s Green Energy Corridor Phase-III, Highlights Role of Battery Storage

BMW Opens €1 Billion Battery Plant in Germany, Starts Gen6 Battery Production

BMW Opens €1 Billion Battery Plant in Germany, Starts Gen6 Battery Production

Leave A Reply Cancel Reply

20 − 8 =

Renewable energy
Juniper Green Energy Commissions 15.5 MW Wind Capacity, Operational Portfolio Reaches 2,740 MW

Juniper Green Energy Commissions 15.5 MW Wind Capacity, Operational Portfolio Reaches 2,740 MW

October 3, 2026
UN Welcomes India’s Green Energy Corridor Phase-III, Highlights Role of Battery Storage

UN Welcomes India’s Green Energy Corridor Phase-III, Highlights Role of Battery Storage

October 3, 2026
Green Water & Power Partners with Goodwill SoCal to Train Workers in Electrical Trades

Green Water & Power Partners with Goodwill SoCal to Train Workers in Electrical Trades

October 3, 2026
VoltSeal Vision for Intelligent Energy Storage

Building More Than Batteries: VoltSeal’s Vision for Intelligent Energy Storage and India’s Energy Sovereignty

October 3, 2026
Batteries
China Connects 100 MW/1,000 MWh Compressed CO₂ Energy Storage Project to Grid

China Connects 100 MW/1,000 MWh Compressed CO₂ Energy Storage Project to Grid

October 3, 2026
BMW Opens €1 Billion Battery Plant in Germany, Starts Gen6 Battery Production

BMW Opens €1 Billion Battery Plant in Germany, Starts Gen6 Battery Production

October 3, 2026
Northland Power Secures US$128.66 Million Financing for 1.2 GWh BESS Projects in Poland

Northland Power Secures US$128.66 Million Financing for 1.2 GWh BESS Projects in Poland

October 3, 2026
ACME Solar Commissions 107.36 MW/437.49 MWh BESS Capacity Across Two Projects in Rajasthan

ACME Solar Commissions 107.36 MW/437.49 MWh BESS Capacity Across Two Projects in Rajasthan

October 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.