Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Solar » Juniper Green Energy Commissions 42 MWp Solar Component of Hybrid Power Project in Gujarat
Solar

Juniper Green Energy Commissions 42 MWp Solar Component of Hybrid Power Project in Gujarat

Shivangi GuptaBy Shivangi GuptaNovember 24, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Juniper Green Energy Commissions 42 MWp Solar Component of Hybrid Power Project in Gujarat

Juniper Green Energy Limited, through its wholly owned subsidiary Juniper Green Spark Four Private Limited, has commissioned approximately 42 MWp of solar capacity as part of its wind-solar hybrid power project in Gujarat. The commissioning was completed on November 22, 2026, taking the project’s total commissioned capacity to around 124 MWp against the planned capacity of 152 MWp.

The commissioning was witnessed and confirmed by officials from the Gujarat Energy Development Agency (GEDA) and Paschim Gujarat Vij Company Limited (PGVCL). The company stated that the formal commissioning certificate is expected to be issued shortly.

The newly commissioned solar component forms part of the subsidiary’s 120 MW wind-solar hybrid power project. With this development, the project has progressed further towards its planned capacity, with approximately 28 MWp of capacity remaining to be commissioned.

Juniper Green Energy’s Operational Capacity

Following the latest commissioning, the aggregate operational capacity of Juniper Green Energy and its subsidiaries has reached approximately 2,994 MWp. The company also has around 698 MWh of operational Battery Energy Storage System (BESS) capacity as of November 22, 2026.

The latest development follows an earlier company intimation dated September 11, 2026, regarding the project. However, the company has not specified a timeline for commissioning the remaining capacity.

Juniper Green Energy’s Renewable Energy Portfolio

Juniper Green Energy is an independent power producer (IPP) in India engaged in developing, constructing, operating and maintaining utility-scale renewable energy projects. Its portfolio includes solar, wind and hybrid power projects, supported by in-house engineering, procurement and construction (EPC) and operations and maintenance (O&M) capabilities.

The company generates revenue through electricity sales to various off-takers, including central and state government-backed entities.

The commissioning adds to Juniper Green Energy’s operational renewable energy portfolio and reflects continued progress in expanding its solar and hybrid power generation capacity in India.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS Juniper Green Energy renewable energy Solar Power Wind-Solar Hybrid
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

ZE Energy Acquires 59 MW/472 MWh BESS Project in Italy from ReFeel New Energy

ZE Energy Acquires 59 MW/472 MWh BESS Project in Italy from ReFeel New Energy

Ford Begins LFP Battery Cell Production in Michigan, Expands Battery Manufacturing Business

Ford Begins LFP Battery Cell Production in Michigan, Expands Battery Manufacturing Business

Holliston and Onyx Renewables Activate 3.4 MW Solar-Plus-Storage Project in Massachusetts

Holliston and Onyx Renewables Activate 3.4 MW Solar-Plus-Storage Project in Massachusetts

Leave A Reply Cancel Reply

one + seven =

Renewable energy
Holliston and Onyx Renewables Activate 3.4 MW Solar-Plus-Storage Project in Massachusetts

Holliston and Onyx Renewables Activate 3.4 MW Solar-Plus-Storage Project in Massachusetts

November 24, 2026
CleanMax Approves Up to ₹214.49 Crore Investment in Gujarat Renewable Energy Subsidiary

CleanMax Approves Up to ₹214.49 Crore Investment in Gujarat Renewable Energy Subsidiary

November 24, 2026
Uttar Pradesh Proposes ₹3,750 Crore Rooftop Solar Project for 5 Lakh Households

Uttar Pradesh Proposes ₹3,750 Crore Rooftop Solar Project for 5 Lakh Households

November 24, 2026
CERC Approves 1,050 MW NHPC Greenshoe Renewable Capacity at ₹4.48/kWh

CERC Approves 1,050 MW NHPC Greenshoe Renewable Capacity at ₹4.48/kWh

November 24, 2026
Batteries
ZE Energy Acquires 59 MW/472 MWh BESS Project in Italy from ReFeel New Energy

ZE Energy Acquires 59 MW/472 MWh BESS Project in Italy from ReFeel New Energy

November 24, 2026
Ford Begins LFP Battery Cell Production in Michigan, Expands Battery Manufacturing Business

Ford Begins LFP Battery Cell Production in Michigan, Expands Battery Manufacturing Business

November 24, 2026
MP Cabinet Approves 200 MW Omkareshwar Floating Solar Expansion with 800 MWh BESS

MP Cabinet Approves 200 MW Omkareshwar Floating Solar Expansion with 800 MWh BESS

November 24, 2026
LONGi Unveils Solar-Storage Technology Vision at COP31, Targets Wider Access to Clean Energy

LONGi Unveils Solar-Storage Technology Vision at COP31, Targets Wider Access to Clean Energy

November 24, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.