Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Ola Electric enters the utility-scale energy storage market and signs its first MoU with Axis Energy
Batteries

Ola Electric enters the utility-scale energy storage market and signs its first MoU with Axis Energy

Shivangi GuptaBy Shivangi GuptaAugust 5, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
Ola Electric enters the utility-scale energy storage market and signs its first Memorandum of Understanding with Axis Energy

The first Memorandum of Understanding for Mahashakti, Ola’s Utility-Scale and C&I energy storage platform, is set to debut on August 15. According to the agreement, up to 20 GWh may be deployed by 2032, with a ramp-up of 5 GWh per year starting in 2028. As India’s first cell-to-system platform, Ola’s vertically integrated strategy aims to improve supply security, safety, and total cost of ownership.

Ola Electric Mobility Limited today announced that it has signed a Memorandum of Understanding (MoU) with Axis Energy outlining the potential deployment of up to 20 GWh of battery energy storage systems by 2032.
The MoU is the first large-scale partnership for Ola Mahashakti, Ola’s forthcoming energy storage platform for commercial, industrial and utility-scale applications, scheduled to launch on 15 August. The partnership is an early demonstration of the scale of demand Mahashakti can address. It establishes utility-scale BESS as a significant new growth avenue for Ola.

Axis Energy is building one of India’s largest pipelines of storage-backed renewable projects. The company has secured grid approvals for over 3,750 MW Projects in Andhra Pradesh and Rajasthan and has a strong pipeline of 3500 MW. These projects, spanning Firm and Dispatchable Renewable Energy (FDRE), hybrid, and other non-solar configurations, will require large-scale BESS to improve renewable energy integration, enhance grid reliability, and deliver firm, round-the-clock clean energy.

India’s energy transition will require storage deployment at an unprecedented scale. The Central Electricity Authority (CEA) estimates that India will require 400+ GWh by 2032. Mahashakti addresses this opportunity with a first-of-its-kind India-designed and India-manufactured BESS platform spanning renewable-energy integration, industrial power, grid infrastructure and data-centre applications.

Ola’s proposition is built on vertical integration, from cell technology to manufacturing and system engineering. This is designed to give customers greater control over safety and performance, stronger supply-chain security and a lower total cost of ownership over the system’s operating life.

Commenting on the association, Ravi Kumar Reddy Kataru, Chairman and Managing Director, Axis Energy Ventures, said, “As our renewable energy portfolio continues to expand, battery energy storage is quintessential to enabling reliable, round-the-clock clean power. This MoU marks an important step towards evaluating indigenous battery storage solutions that will support the next phase of our renewable energy growth.”
Bhavish Aggarwal, Chairman and Managing Director, Ola Electric, said, “India will need energy storage at a massive scale and our vertically integrated cell-to-system platform enables us to deliver a stronger proposition across safety, performance and total cost of ownership. Axis Energy is our first large-scale partner and an important early validation of Mahashakti’s potential. We are witnessing a strong interest from potential partners in the industry, and this MoU further strengthens our momentum in building long-term partnerships.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS energy storage Energy Storage Solutions energy transition India News memorandum of understanding Ola Electric
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Growatt Unveils MINA All-in-One Home Energy Storage System for Residential Solar

Growatt Unveils MINA All-in-One Home Energy Storage System for Residential Solar

BlackBuck EV, Chalo Partner to Deploy Up to 300 Premium Electric Buses Across India

BlackBuck EV, Chalo Partner to Deploy Up to 300 Premium Electric Buses Across India

Rajesh Power Services Wins ₹363 Crore PGVCL Contract to Modernise Gujarat Power Distribution Network

Rajesh Power Services Wins ₹362.82 crore PGVCL Contract to Modernise Gujarat Power Distribution Network

Leave A Reply Cancel Reply

12 − ten =

Renewable energy
Growatt Unveils MINA All-in-One Home Energy Storage System for Residential Solar

Growatt Unveils MINA All-in-One Home Energy Storage System for Residential Solar

August 5, 2026
BlackBuck EV, Chalo Partner to Deploy Up to 300 Premium Electric Buses Across India

BlackBuck EV, Chalo Partner to Deploy Up to 300 Premium Electric Buses Across India

August 5, 2026
Oyster Renewable Commissions 52.8 MW Gujarat Wind Project for Jindal Stainless

Oyster Renewable Commissions 52.8 MW Gujarat Wind Project for Jindal Stainless

August 5, 2026
Vikram Solar Unveils $1.9 Billion Expansion Plan, Enters Battery Storage Manufacturing

Vikram Solar Unveils $1.9 Billion Expansion Plan, Enters Battery Storage Manufacturing

August 5, 2026
Batteries
Evren Signs 750 MW Renewable Energy PPA with NTPC, Strengthening Clean Energy Portfolio

Evren Signs 750 MW Renewable Energy PPA with NTPC, Strengthening Clean Energy Portfolio

August 5, 2026
Industry Backs GST Reduction Proposal to Boost Battery Storage Deployment

India’s Energy Storage Industry Backs 5% GST Proposal to Boost Clean Energy Deployment

August 5, 2026
Serentica Renewables Commissions 200 MWh BESS, Begins 1 GWh Storage Project in Rajasthan

Serentica Renewables Commissions 200 MWh BESS, Begins 1 GWh Storage Project in Rajasthan

August 5, 2026
Ola Electric enters the utility-scale energy storage market and signs its first Memorandum of Understanding with Axis Energy

Ola Electric enters the utility-scale energy storage market and signs its first MoU with Axis Energy

August 5, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.