Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Pace Digitek Secures ₹94.35 Crore Li-ion Battery Order from BSNL
Batteries

Pace Digitek Secures ₹94.35 Crore Li-ion Battery Order from BSNL

ManshiBy ManshiJanuary 2, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Pace Digitek Secures ₹94.35 Crore Li-ion Battery Order from BSNL

Pace Digitek Ltd, through its subsidiary Lineage Power Private Limited, has secured an advance purchase order worth ₹94.35 crore (including GST) from Bharat Sanchar Nigam Ltd. (BSNL) for high-performance lithium-ion battery systems. The order falls under domestic procurement and supports telecom infrastructure, highlighting the company’s growing footprint in energy storage and power solutions.

The contract involves the supply of 25,000 Basic 100 AH/48V Li-ion Battery Modules equipped with Battery Management Systems (BMS) along with all necessary accessories for the battery sets. In addition, 2,500 IP55 racks will be supplied to house eight 48V/100AH modules each, including required accessories such as 10-metre RJ45 cables to connect the master BMS with SMPS PP-CSU.

The agreement also covers a five-year annual maintenance contract following a five-year warranty for the battery modules and associated accessories. The execution period for the contract is five months from the date of receipt of the purchase order. The company clarified that the order does not involve related-party transactions, and neither the promoter nor promoter group has any interest in BSNL.

Commenting on the development, a spokesperson from Pace Digitek stated, “This significant order win reinforces our leadership in energy storage and high-performance battery solutions. It demonstrates our capability to deliver large-scale, precision-engineered Li-ion battery systems for critical infrastructure applications, including telecom.”

This order adds to Lineage Power’s expanding portfolio of energy storage projects. In recent months, the company has secured multiple high-value orders, including:

  • ₹997.1 million order from Advait Greenergy for LFP-based BESS
  • ₹199.42 crore contract from L&T Construction for liquid-cooled LiFePO₄ BESS containers in Bihar
  • ₹1,159.31 crore order from SECI for a 600 MW/1,200 MWh BESS DC package

Earlier in June 2025, Union Minister for New and Renewable Energy Pralhad Joshi inaugurated Pace Digitek’s 5 GWh BESS manufacturing facility at the Bidadi Industrial Area, Bengaluru, featuring a fully automated cell-to-pack assembly line for high-quality production with minimal human intervention.

This BSNL order reflects the company’s strong capabilities in telecom and industrial energy storage solutions, consolidating its position as a leading player in India’s lithium-ion battery and BESS market.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
energy storage India News lithium-ion battery power solutions
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

Comments are closed.

Renewable energy
Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

July 21, 2026
GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

July 21, 2026
India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

July 21, 2026
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Batteries
Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.