Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » SPML Infra Secures ₹1,128 Crore (USD 120 million) 1 GWh Battery Energy Storage Project from NTPC in India
Battery Manufacturing (BESS)

SPML Infra Secures ₹1,128 Crore (USD 120 million) 1 GWh Battery Energy Storage Project from NTPC in India

Sanjana NegiBy Sanjana NegiMay 6, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Abhinandan Sethi

SPML Infra Limited, (NSE:SPMLINFRA, BSE:500402), a leading publicly listed infrastructure development company in India, has secured a landmark ₹1,128 crore (USD 120 million) contract to develop a 1 GWh Battery Energy Storage System (BESS) at NTPC Limited’s Barauni Thermal Power Station in Bihar, marking the first large-scale grid Battery Energy Storage System project for SPML Infra.

Awarded by the National Thermal Power Corporation (NTPC), this project ranks among the largest single BESS orders awarded in India, signalling a defining moment not just for SPML Infra, but for the country’s clean energy ambitions.

The scope of work included design, engineering, supply, civil works, erection and commissioning of 250 MW/1,000 MWh Battery Energy Storage System (BESS) comprising 5 MWh DC containers with Battery Management System (BMS) and Thermal Management System (TMS), 33 kV panel boards, 220 kV DC & AC cables, 220 kV switchyard and all associated accessories. The project will be executed over an 18-months period followed by a 15 years of operation and maintenance.

The project will seamlessly integrate large-scale battery storage with existing thermal power infrastructure enabling peak load management, grid stability, and efficient integration of renewable power. As India’s power networks evolve, Battery Energy Storage Systems are fast becoming the backbone of a stable, responsive, and future-ready electricity grid.

Abhinandan Sethi, Managing Director, SPML Infra Limited, said“This order marks a defining moment for SPML Infra, a firm commitment to the large-scale battery energy storage sector. Energy storage will define how India powers its future, and we intend to be architects of that transformation. Partnering with NTPC on this landmark project is both a privilege and a responsibility we embrace fully. We are here to build the grid India needs — flexible, stable, and built for scale.”

 This anchors SPML Infra’s broader strategic push into energy storage infrastructure, advancing its commitment to developing cutting-edge battery energy storage solutions in collaboration with its technology partner, Energy Vault (NYSE: NRGV), tailored to meet India’s scale and ambition. Energy storage is no longer a future priority for SPML Infra; it is a core pillar of growth today. With this order, SPML Infra strengthens its position in India’s emerging battery energy storage ecosystem.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
batteryenergystorage BESS ecosystem India News NTPC
Sanjana Negi
  • Website

News contributor at The Battery Magazine. I write on the latest developments in battery technology, energy storage solutions, and power innovations. Committed to delivering accurate and timely updates from the world of batteries.

Keep Reading

MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

CERC Orders CTUIL to Restore Connectivity for Pace Digitek’s 100 MW Solar-BESS Project

CERC Orders CTUIL to Restore Connectivity for Pace Digitek’s 100 MW Solar-BESS Project

Coal India has put 200 MW of the 300 MW Khavda Solar Project into service

Coal India has put 200 MW of the 300 MW Khavda Solar Project into service

Leave A Reply Cancel Reply

5 + five =

Renewable energy
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026
CERC Orders CTUIL to Restore Connectivity for Pace Digitek’s 100 MW Solar-BESS Project

CERC Orders CTUIL to Restore Connectivity for Pace Digitek’s 100 MW Solar-BESS Project

July 17, 2026
Coal India has put 200 MW of the 300 MW Khavda Solar Project into service

Coal India has put 200 MW of the 300 MW Khavda Solar Project into service

July 17, 2026
GRE Renew Enertech Crosses 100 MWp Solar Installations, Builds Rs. 224 Crore Order Book

GRE Renew Enertech Crosses 100 MWp Solar Installations, Builds Rs. 224 Crore Order Book

July 17, 2026
Batteries
The Rural Development Department of Uttar Pradesh, Grants Servotech Renewable a 900 kW Hybrid Solar Rooftop with BESS Project

The Rural Development Department of Uttar Pradesh, Grants Servotech Renewable a 900 kW Hybrid Solar Rooftop with BESS Project

July 17, 2026
CATL and Alfen Will Deploy 5 GWh of Sodium-ion Battery Storage Across Europe

CATL and Alfen Will Deploy 5 GWh of Sodium-ion Battery Storage Across Europe

July 17, 2026
Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh

Assam Starts Preparing BESS with Consultancy Tender for 25 MW/100 MWh

July 16, 2026
XAVOLT Energy Signs MoU with DRIIV to Advance Affordable Battery Energy Storage Solutions

XAVOLT Energy Signs MoU with DRIIV to Advance Affordable Battery Energy Storage Solutions

July 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.