Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » TDB Clarifies RDI Scheme Call Closure, Says No Fund Shortage
Renewable energy

TDB Clarifies RDI Scheme Call Closure, Says No Fund Shortage

Shivangi GuptaBy Shivangi GuptaOctober 1, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
TDB Clarifies RDI Scheme Call Closure, Says No Fund Shortage

The Technology Development Board (TDB) has clarified that the closure of its ongoing call for proposals under the Research Development & Innovation (RDI) Scheme was due to administrative reasons and not a shortage of funds.

TDB said the call, which had been open since February 4, 2026, was closed as part of an administrative decision amid an unprecedented response from eligible technology entities (ETEs). The clarification follows media reports that attributed the closure to a shortage of funds.

According to TDB, there is no shortage of funds for disbursement to ETEs. The board had estimated a requirement of ₹500 crore for disbursements over a six-month period and was allocated ₹490 crore by the Research Development and Innovation Fund (RDIF).

As of September 30, 2026, TDB had disbursed ₹375.69 crore to 10 ETEs from the first cohort of 22 ETEs. The board still had ₹114.31 crore available for disbursement.

Under the RDI Scheme, TDB provides matching funds against funds raised by ETEs from non-government sources. The actual disbursement depends on the time taken by the respective ETEs to raise the required matching funds and submit a demand notice to TDB.

TDB said it received nearly 330 project proposals between February 4 and September 30, 2026. So far, the board has evaluated 99 projects received during February and March. Of these, 35 projects were selected for funding, comprising 22 projects in the first cohort and 13 in the second cohort.

Projects received during April and May 2026 are currently under evaluation. TDB said its Investment Committee and officials are conducting group-stage meetings for the initial screening and shortlisting of proposals, followed by detailed evaluation by the full Investment Committee.

The board noted that its techno-commercial evaluation process requires considerable time. During the first seven months from March to September 2026, around 150 projects, including those currently under evaluation, could be processed.

In view of the large number of proposals and the ongoing evaluation process, TDB has decided to temporarily pause the call for proposals. The call is expected to reopen after the assessment of all projects received up to September 30, 2026, is completed.

The Department of Science and Technology (DST) and the Anusandhan National Research Foundation (ANRF) are also in the process of assigning several other Sectoral-Level Fund Managers (SLFMs) in the near future.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
DST India News RDI Scheme research and development TDB Technology Development Board
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

TrueRE Oriana Power Plans Five CBG Plants Across Three States

TrueRE Oriana Power Plans Five CBG Plants Across Three States

Bhutan Extends Chhukha Power Export Agreement with India

Bhutan, PTC India Extend Chhukha Hydropower Export Agreement Until 2031

MULTIFIT Strengthens Its Solar and Battery Storage Portfolio

MULTIFIT Expands Solar Storage Portfolio with Hybrid Inverters and Integrated Battery Systems

Leave A Reply Cancel Reply

one + 5 =

Renewable energy
TrueRE Oriana Power Plans Five CBG Plants Across Three States

TrueRE Oriana Power Plans Five CBG Plants Across Three States

November 20, 2026
Bhutan Extends Chhukha Power Export Agreement with India

Bhutan, PTC India Extend Chhukha Hydropower Export Agreement Until 2031

November 20, 2026
KKR Takes Minority Stake in Gentari’s India Renewables Platform

KKR Takes Minority Stake in Gentari’s India Renewables Platform

November 20, 2026
APTEL Scraps rs 0.50 Rate for Excess Wind Power

APTEL Orders Full Tariff Payment for Wind Power Beyond Normative CUF

November 20, 2026
Batteries
MULTIFIT Strengthens Its Solar and Battery Storage Portfolio

MULTIFIT Expands Solar Storage Portfolio with Hybrid Inverters and Integrated Battery Systems

November 20, 2026
Four Firms Advance Under Rare Earth Magnet Scheme

Coal India, ReNew Among Four Firms Advancing Under ₹7,280-Crore Rare Earth Magnet Scheme

November 20, 2026
Juniper Green Commissions 108.50 MWp Solar, 94.77 MWh BESS

Juniper Green Adds 108.50 MWp Solar and 94.77 MWh Storage to Portfolio

November 20, 2026
Midwest Energy Wins LoI for 1,200 MTPA Magnets

Midwest Energy Secures LoI for 1,200 MTPA Rare Earth Magnet Project Under Centre’s ₹7,280-Crore Scheme

November 20, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.