Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Vikram Solar Unveils 5 GW Vallam Facility, Boosting India’s Solar Manufacturing Capacity
Batteries

Vikram Solar Unveils 5 GW Vallam Facility, Boosting India’s Solar Manufacturing Capacity

PrakashBy PrakashNovember 26, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
Vikram Solar Unveils 5 GW Vallam Facility, Boosting India's Solar Manufacturing Capacity

Vikram Solar, a pioneer in India’s solar PV landscape, has announced the commissioning of its state-of-the-art Vallam manufacturing facility in Tamil Nadu, adding 5 GW of advanced module production capacity. With this next-gen expansion, the company now commands a total manufacturing capacity of 9.5 GW, reinforcing its role as a top-tier, scale-driven player in solar technology and underscoring its growing influence in shaping India’s solar future.

Designed as a future-ready, large-scale manufacturing centerpiece, the Vallam plant represents a significant technological leap for the clean energy ecosystem in India. It incorporates a sophisticated layer of next-generation automation, much of it being deployed in the country for the first time, seamlessly integrating intelligent robotics, advanced material-handling systems, comprehensive built-in quality checks, and fully automated packaging. This elevated automation architecture enhances manufacturing precision, accelerates throughput, strengthens process reliability, and sets a new benchmark for operational excellence at scale

Spanning 27,000 sq. m, the plant is built on advanced TOPCon technology, engineered for seamless HJT upgrades, and designed to support M10, G12, and G12R formats, underscoring Vikram Solar’s commitment to future-ready technology leadership.

For customers, the new facility translates directly into higher value and performance. The plant’s advanced automation ensures consistent product quality, resulting in more reliable modules with lower failure rates and long-term durability. Automated precision also drives higher performance and reduced degradation, translating into better energy yields over the product’s life. With fewer defects, faster production, and improved supply reliability, customers benefit from predictable deliveries and shorter lead times. Every module meets Tier-1 and international quality standards, giving customers confidence in safe, compliant, and globally benchmarked technology.

The commissioning of Vallam strengthens Vikram Solar’s commitment to growing Tamil Nadu’s clean-energy manufacturing ecosystem. It adds to its existing presence in Oragadam and follows the recent foundation ceremony for their upcoming Gangaikondan facility, marking another important milestone in the state. Together, these sites demonstrate Vikram Solar’s long-term strategy of anchoring advanced solar manufacturing and green-tech innovation within Tamil Nadu, one of India’s fastest-growing renewable energy hubs.

Mr. Gyanesh Chaudhary, Chairman & Managing Director, Vikram Solar, said:

“Vallam is a defining milestone for Vikram Solar and for India’s solar manufacturing story. Commissioning this 5 GW facility within the year was a bold commitment, and delivering on it signals our readiness for the scale, speed, and innovation the next decade demands. As we complete over 20 years in this industry, this facility reflects our intent to shape what comes next: advanced manufacturing, automation-led quality, and technology platforms that become new benchmarks for the sector. Vallam strengthens India’s value chain, and it reinforces our confidence that Indian clean tech can lead globally, not just participate.”

Modules manufactured at the Vallam facility will be supplied to customers across India, supporting utility-scale developers, C&I customers, and distributed generation projects as the nation accelerates toward its ambitious renewable energy goals.

Reinforcing its commitment to inclusive growth, Vikram Solar is working toward achieving 40–50% gender diversity within the plant’s baseline workforce, an important step toward creating a modern, equitable, and future-oriented manufacturing environment in India.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy Module Manufacturing renewable energy solar technology Vikram Solar
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

India Sets Out Rs 60,000-Crore Roadmap

India Sets Out Rs 60,000-Crore Roadmap to Build a Future-Ready Workforce

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.